IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,106

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0141 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,348 $900 Implemented
DS0141 # 05 Y:1999 05 1999 UPGRADE OBSOLETE EQUIPMENT $13,679 $32,000 Implemented
DS0141 # 06 Y:1999 06 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,184 $1,200 Implemented
DS0141 # 07 Y:1999 07 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $77,215 $0 Not Implemented
DS0141 # 08 Y:1999 08 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $6,612 $400 Not Implemented
DS0141 # 09 Y:1999 09 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $3,240 $1,000 Not Implemented
DS0141 # 10 Y:1999 10 1999 INCREASE USE OF AUTOMATION $416,318 $440,000 Not Implemented
WI0343 # 01 Y:1999 01 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $22,608 $500 Not Implemented
WI0343 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,616 $94,400 Not Implemented
WI0343 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,468 $60 Implemented
WI0343 # 04 Y:1999 04 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,053 $9,000 Not Implemented
WI0343 # 05 Y:1999 05 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $3,188 $8,500 Not Implemented
WI0343 # 06 Y:1999 06 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $1,792 $0 Not Implemented
WI0343 # 07 Y:1999 07 1999 INSTALL OCCUPANCY SENSORS $1,203 $1,900 Not Implemented
WI0343 # 08 Y:1999 08 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $415 $203 Not Implemented
WI0343 # 09 Y:1999 09 1999 REPLACE CLOTH RAGS WITH PAPER TOWELS $680 $0 Not Implemented
UD0564 # 01 Y:1999 01 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $220,632 $300,000 Not Implemented
UD0564 # 02 Y:1999 02 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $22,972 $148 Implemented
UD0564 # 03 Y:1999 03 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,776 $49,660 Not Implemented
UD0564 # 04 Y:1999 04 1999 COVER OPEN TANKS $13,847 $2,400 Implemented
UD0564 # 05 Y:1999 05 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $10,689 $0 Implemented
UD0564 # 06 Y:1999 06 1999 METER WASTE WATER $5,686 $2,200 Not Implemented
UD0564 # 07 Y:1999 07 1999 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,767 $3,375 Implemented
UD0564 # 08 Y:1999 08 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,156 $5,096 Not Implemented
UD0564 # 09 Y:1999 09 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $218 $684 Not Implemented