IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,106

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0948 # 06 Y:2016 06 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $87,713 $52,000 Implemented
UD0948 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,997 $50 Not Implemented
UD0948 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $35,398 $0 Implemented
UD0948 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $49,905 $20,000 Not Implemented
UD0948 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $23,367 $2,838 Not Implemented
UD0948 # 01 Y:2016 01 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $353,342 $60,000 Not Implemented
WM0081 # 01 Y:2016 01 2016 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $108,824 $71,331 Not Implemented
WM0081 # 02 Y:2016 02 2016 USE RADIANT HEATER FOR SPOT HEATING $41,066 $7,400 Not Implemented
WM0081 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $48,136 $20,000 Not Implemented
WM0081 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,666 $4,583 Not Implemented
WM0081 # 05 Y:2016 05 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $8,381 $1,000 Implemented
WM0081 # 06 Y:2016 06 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,837 $2,625 Not Implemented
WM0081 # 07 Y:2016 07 2016 INSULATE BARE EQUIPMENT $4,636 $7,160 Not Implemented
WM0081 # 08 Y:2016 08 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,981 $2,000 Implemented
WM0081 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $450 $180 Not Implemented
MZ0193 # 01 Y:2015 01 2015 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $21,804 $700 Implemented
MZ0193 # 02 Y:2015 02 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,714 $1,160 Implemented
MZ0193 # 03 Y:2015 03 2015 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $62,777 $37,500 Implemented
MZ0193 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,733 $5,660 Not Implemented
SD0518 # 01 Y:2015 01 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $26,723 $60,280 Not Implemented
SD0518 # 02 Y:2015 02 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,705 $25,900 Not Implemented
SD0518 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,578 $13,930 Not Implemented
SD0518 # 04 Y:2015 04 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,761 $4,200 Not Implemented
SD0518 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,701 $1,700 Not Implemented
SD0518 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,585 $200 Not Implemented