IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,106

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0420 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,061 $500 Not Implemented
BD0420 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $857 $2,925 Not Implemented
BD0420 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $756 $2,100 Not Implemented
BD0420 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $746 $20 Not Implemented
BD0420 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $608 $3,000 Not Implemented
BD0420 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $275 Not Implemented
UM0402 # 01 Y:2012 01 2012 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,681 $200 Implemented
UM0402 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,300 $200 Implemented
UM0402 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,496 $2,000 Implemented
UM0402 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $7,600 $2,000 Not Implemented
UM0402 # 05 Y:2012 05 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,676 $4,000 Not Implemented
UM0402 # 06 Y:2012 06 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,391 $4,000 Not Implemented
UM0402 # 07 Y:2012 07 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $52,867 $2,000 Not Implemented
UM0402 # 08 Y:2012 08 2012 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $11,060 $15,000 Not Implemented
MZ0087 # 01 Y:2012 01 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $22,109 $8,488 Not Implemented
MZ0087 # 02 Y:2012 02 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,564 $0 Not Implemented
MZ0087 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,921 $27,100 Not Implemented
MZ0087 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $263 $190 Not Implemented
MZ0087 # 05 Y:2012 05 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $41,961 $100,000 Not Implemented
MZ0087 # 06 Y:2012 06 2012 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $9,430 $3,000 Not Implemented
MZ0087 # 07 Y:2012 07 2012 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $991 $0 Not Implemented
UMS004 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $200,000 $200,000 Not Implemented
UMS004 # 02 Y:2012 02 2012 CONVERT TO OXYFUEL BURNERS $156,000 $250,000 Not Implemented
UMS004 # 03 Y:2012 03 2012 COVER OPEN TANKS $41,000 $32,000 Not Implemented
UMS004 # 04 Y:2012 04 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $27,600 $75,000 Not Implemented