IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0549 # 11 Y:2004 11 2004 DISCONNECT BALLASTS $197 $60 Implemented
MA0549 # 01 Y:2004 01 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $32,668 $15,495 Implemented
MA0549 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,739 $8,525 Not Implemented
MA0549 # 03 Y:2004 03 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,668 $2,066 Not Implemented
MA0549 # 04 Y:2004 04 2004 IMPROVE COMBUSTION CONTROL CAPABILITY $8,653 $16,100 Implemented
MA0549 # 05 Y:2004 05 2004 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $5,232 $11,500 Not Implemented
MA0549 # 06 Y:2004 06 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,412 $0 Implemented
MA0549 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,794 $315 Implemented
MA0549 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $1,041 $896 Implemented
MA0549 # 09 Y:2004 09 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,021 $1,100 Implemented
MA0549 # 10 Y:2004 10 2004 INSULATE BARE EQUIPMENT $463 $451 Not Implemented
MA0419 # 08 Y:1998 08 1998 OPTIMIZE PLANT POWER FACTOR $2,539 $7,125 Not Implemented
MA0419 # 07 Y:1998 07 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,739 $0 Implemented
MA0419 # 06 Y:1998 06 1998 PAY BILLS ON TIME TO AVOID LATE FEES $3,967 $0 Implemented
MA0419 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,822 $9,000 Implemented
MA0419 # 04 Y:1998 04 1998 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $10,000 $3,120 Implemented
MA0419 # 03 Y:1998 03 1998 ADJUST BURNERS FOR EFFICIENT OPERATION $36,192 $201,500 Not Implemented
MA0419 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,360 $118,235 Implemented
MA0419 # 01 Y:1998 01 1998 COVER OPEN TANKS $168,295 $5,000 Implemented
MA0401 # 11 Y:1997 11 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,660 $2,000 Not Implemented
MA0401 # 10 Y:1997 10 1997 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $2,700 $400 Not Implemented
MA0401 # 01 Y:1997 01 1997 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $21,102 $70,000 Not Implemented
MA0401 # 02 Y:1997 02 1997 COVER OPEN TANKS $10,768 $0 Implemented
MA0401 # 03 Y:1997 03 1997 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $1,927 $0 Implemented
MA0401 # 04 Y:1997 04 1997 UPGRADE CONTROLS ON COMPRESSORS $4,875 $10,000 Implemented