Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
88
matching recommendationsSIC | 3363 | Aluminum Die-castings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0085 # 10 Y:2004 | 10 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $54,080 | $3,320 | Implemented |
LM0085 # 09 Y:2004 | 09 | 2004 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $3,360 | $1,850 | Implemented |
LM0085 # 08 Y:2004 | 08 | 2004 | DEVELOP STANDARD OPERATING PROCEDURES | $18,000 | $2,450 | Implemented |
LM0085 # 07 Y:2004 | 07 | 2004 | $9,060 | $1,500 | Implemented | |
LM0085 # 06 Y:2004 | 06 | 2004 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $26,300 | $4,450 | Implemented |
LM0085 # 05 Y:2004 | 05 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $5,902 | $600 | Implemented |
LM0085 # 04 Y:2004 | 04 | 2004 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,335 | $741 | Not Implemented |
LM0085 # 03 Y:2004 | 03 | 2004 | CLEAN FOULING FROM WATER LINES REGULARLY | $2,852 | $180 | Implemented |
LM0085 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $167 | $0 | Implemented |
LM0085 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,324 | $205 | Implemented |
NC0296 # 01 Y:2004 | 01 | 2004 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $39,660 | $7,500 | Implemented |
NC0296 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $79 | $293 | Not Implemented |
NC0296 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $234 | $660 | Implemented |
NC0296 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $241 | $288 | Implemented |
NC0296 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,821 | $100 | Implemented |
NC0296 # 04 Y:2004 | 04 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,604 | $7,125 | Not Implemented |
NC0296 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,562 | $2,000 | Implemented |
NC0296 # 02 Y:2004 | 02 | 2004 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $22,518 | $10,000 | Not Implemented |
IA0345 # 17 Y:2004 | 17 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $2,145 | $399 | Implemented |
IA0345 # 19 Y:2004 | 19 | 2004 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $36,818 | $85,000 | Not Implemented |
IA0345 # 18 Y:2004 | 18 | 2004 | MOVE PRODUCT USING MECHANICAL MEANS | $11,717 | $11,122 | Not Implemented |
IA0345 # 16 Y:2004 | 16 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $4,290 | $1,100 | Implemented |
IA0345 # 15 Y:2004 | 15 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $4,290 | $1,035 | Implemented |
IA0345 # 08 Y:2004 | 08 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,305 | $2,330 | Implemented |
IA0345 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $1,206 | $2,062 | Implemented |