IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0296 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $66,640 $2,000 Not Implemented
TT0296 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,069 $270 Not Implemented
TT0296 # 11 Y:2023 11 2023 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $2,853 $7,500 Not Implemented
TT0296 # 10 Y:2023 10 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $203,680 $300,000 Not Implemented
TT0296 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,690 $8,100 Implemented
TT0296 # 08 Y:2023 08 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,078 $4,500 Not Implemented
TT0296 # 07 Y:2023 07 2023 OPTIMIZE PLANT POWER FACTOR $41,037 $32,500 Not Implemented
TT0296 # 06 Y:2023 06 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $81,000 $60,000 Implemented
TT0296 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,264 $1,920 Implemented
TT0296 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $22,207 $1,640 Implemented
TT0296 # 03 Y:2023 03 2023 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $200,000 $10,000 Not Implemented
WM0194 # 09 Y:2023 09 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $9,970 $2,832 Implemented
WM0194 # 08 Y:2023 08 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,050 $20,480 Not Implemented
WM0194 # 07 Y:2023 07 2023 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $15,440 $9,000 Not Implemented
WM0194 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $35,203 $110,000 Implemented
WM0194 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $38,839 $6,800 Not Implemented
WM0194 # 04 Y:2023 04 2023 PAY BILLS ON TIME TO AVOID LATE FEES $41,818 $0 Implemented
WM0194 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,924 $39,795 Implemented
WM0194 # 02 Y:2023 02 2023 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $161,122 $300,000 Not Implemented
WM0194 # 01 Y:2023 01 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $202,110 $250,000 Not Implemented
WM0189 # 08 Y:2023 08 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $614 $880 Not Implemented
WM0189 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $683 $2,500 Implemented
WM0189 # 06 Y:2023 06 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $873 $5,496 Implemented
WM0189 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,529 $2,900 Not Implemented
WM0189 # 04 Y:2023 04 2023 COMBINE UTILITY METERS $2,274 $0 Implemented