IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

646

matching recommendations
Reset
SIC 3365 Aluminum Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0220 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,665 $2,875 n/a
WM0220 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,427 $0 n/a
WM0220 # 04 Y:2024 04 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $7,912 $0 n/a
WM0220 # 01 Y:2024 01 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $134,386 $400,000 n/a
WM0220 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $2,908 $2,206 n/a
WM0219 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,902 $3,000 n/a
WM0219 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,325 $6,594 n/a
WM0219 # 04 Y:2024 04 2024 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,229 $0 n/a
WM0219 # 06 Y:2024 06 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $918 $2,370 n/a
WM0219 # 01 Y:2024 01 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $35,918 $200,000 n/a
WM0219 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,556 $0 n/a
SD0632 # 07 Y:2023 07 2023 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $2,044 $8,803 Not Implemented
SD0632 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,102 $7,882 Not Implemented
SD0632 # 01 Y:2023 01 2023 UPGRADE CONTROLS ON COMPRESSORS $616 $100 Not Implemented
SD0632 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $424 $1,176 Not Implemented
SD0632 # 10 Y:2023 10 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $741 $3,554 Not Implemented
SD0632 # 03 Y:2023 03 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $41,916 $76,410 Not Implemented
SD0632 # 08 Y:2023 08 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $936 $3,415 Not Implemented
SD0632 # 09 Y:2023 09 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $27,630 $115,136 Not Implemented
SD0632 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $566 $1,200 Not Implemented
SD0632 # 04 Y:2023 04 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $85,551 $277,200 Not Implemented
UC2207 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $2,876 $500 Not Implemented
UC2207 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,359 $2,800 Not Implemented
UC2207 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,727 $500 Not Implemented
UC2207 # 03 Y:2022 03 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,731 $500 Not Implemented