IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

673

matching recommendations
Reset
SIC 3365 Aluminum Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0004 # 01 Y:1994 01 1994 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $22,872 $50 Not Implemented
MS0004 # 02 Y:1994 02 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,637 $20,000 Not Implemented
MS0004 # 03 Y:1994 03 1994 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $2,702 $651 Not Implemented
MS0004 # 04 Y:1994 04 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,560 $12,000 Not Implemented
MS0004 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,458 $2,600 Not Implemented
WI0211 # 01 Y:1994 01 1994 INSULATE BARE EQUIPMENT $6,890 $6,400 Not Implemented
WI0211 # 02 Y:1994 02 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $611 $1,162 Not Implemented
WI0211 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $389 $225 Not Implemented
WI0211 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,114 $180 Not Implemented
WI0211 # 05 Y:1994 05 1994 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $581 $960 Not Implemented
WI0211 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $361 $50 Not Implemented
WI0211 # 07 Y:1994 07 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $51,400 $100,000 Not Implemented
UD0426 # 01 Y:1994 01 1994 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $24,064 $500 Implemented
UD0426 # 02 Y:1994 02 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,565 $38,000 Implemented
UD0426 # 03 Y:1994 03 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,342 $0 Not Implemented
UD0426 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,032 $400 Implemented
UD0426 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,752 $2,000 Implemented
AS0086 # 01 Y:1993 01 1993 INSULATE BARE EQUIPMENT $1,799 $992 Not Implemented
AS0086 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,024 $2,200 Not Implemented
AS0086 # 03 Y:1993 03 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,461 $1,500 Implemented
AS0086 # 04 Y:1993 04 1993 USE SYNTHETIC LUBRICANT $2,431 $7,164 Not Implemented
AS0086 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,155 $1,200 Implemented
AS0086 # 06 Y:1993 06 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $381 $0 Implemented
AS0086 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $213 $519 Implemented
AS0086 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $379 $1,598 Not Implemented