IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

646

matching recommendations
Reset
SIC 3365 Aluminum Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0247 # 01 Y:1992 01 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,161 $23,631 Implemented
MA0247 # 02 Y:1992 02 1992 RECOVER WASTE HEAT FROM EQUIPMENT $4,947 $1,780 Not Implemented
MA0247 # 03 Y:1992 03 1992 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,936 $1,200 Implemented
MA0247 # 04 Y:1992 04 1992 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $335 $990 Implemented
MA0247 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $801 $12 Implemented
MA0247 # 06 Y:1992 06 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,619 $1,500 Implemented
MA0247 # 07 Y:1992 07 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $689 $0 Implemented
IA0007 # 01 Y:1991 01 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,088 $2,000 Not Implemented
IA0007 # 02 Y:1991 02 1991 RECOVER WASTE HEAT FROM EQUIPMENT $2,408 $686 Not Implemented
IA0007 # 03 Y:1991 03 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $427 $1,095 Not Implemented
IA0007 # 04 Y:1991 04 1991 INSTALL SET-BACK TIMERS $2,348 $0 Not Implemented
IA0007 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $1,110 $1,200 Not Implemented
AM0133 # 01 Y:1991 01 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,600 $12,670 Not Implemented
AM0133 # 02 Y:1991 02 1991 RECOVER WASTE HEAT FROM EQUIPMENT $1,770 $845 Not Implemented
AM0133 # 03 Y:1991 03 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $750 $627 Not Implemented
AM0133 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $690 $300 Not Implemented
AM0133 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $120 $0 Not Implemented
AM0133 # 06 Y:1991 06 1991 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $245 $635 Not Implemented
KU0356 # 01 Y:1991 01 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,101 $57,850 Not Implemented
KU0356 # 02 Y:1991 02 1991 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $9,652 $32,000 Not Implemented
KU0356 # 03 Y:1991 03 1991 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $8,148 $0 Not Implemented
KU0356 # 04 Y:1991 04 1991 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $9,225 $34,500 Not Implemented
KU0356 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $4,112 $1,140 Not Implemented
KU0356 # 06 Y:1991 06 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,478 $725 Not Implemented
MA0208 # 01 Y:1991 01 1991 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $5,634 $400 Implemented