IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 3365 Aluminum Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0632 # 08 Y:2023 08 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $936 $3,415 Not Implemented
SD0632 # 03 Y:2023 03 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $41,916 $76,410 Not Implemented
SD0632 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $566 $1,200 Not Implemented
SD0632 # 01 Y:2023 01 2023 UPGRADE CONTROLS ON COMPRESSORS $616 $100 Not Implemented
SD0632 # 04 Y:2023 04 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $85,551 $277,200 Not Implemented
SD0632 # 10 Y:2023 10 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $741 $3,554 Not Implemented
SD0632 # 09 Y:2023 09 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $27,630 $115,136 Not Implemented
SD0632 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $424 $1,176 Not Implemented
SD0632 # 07 Y:2023 07 2023 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $2,044 $8,803 Not Implemented
SD0632 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,102 $7,882 Not Implemented
SD0273 # 03 Y:2001 03 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,519 $2,000 Implemented
SD0273 # 08 Y:2001 08 2001 $4,000 $3,500 Implemented
SD0273 # 07 Y:2001 07 2001 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) $3,043 $500 Implemented
SD0273 # 06 Y:2001 06 2001 INSTALL SKYLIGHTS $2,734 $6,000 Not Implemented
SD0273 # 05 Y:2001 05 2001 UPGRADE OBSOLETE EQUIPMENT $5,286 $15,000 Implemented
SD0273 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $822 $200 Implemented
SD0273 # 02 Y:2001 02 2001 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $3,094 $1,500 Not Implemented
SD0273 # 01 Y:2001 01 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,369 $2,000 Not Implemented
SD0253 # 05 Y:2000 05 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,622 $7,000 Not Implemented
SD0253 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $108,760 $68,000 Not Implemented
SD0253 # 06 Y:2000 06 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,732 $5,400 Not Implemented
SD0253 # 07 Y:2000 07 2000 $22,500 $15,000 Not Implemented
SD0253 # 04 Y:2000 04 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,561 $12,000 Not Implemented
SD0253 # 03 Y:2000 03 2000 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $20,080 $25,000 Not Implemented
SD0253 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,706 $15,000 Not Implemented