IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

208

matching recommendations
Reset
SIC 3366 Copper Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0647 # 04 Y:2009 04 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $372 $400 Not Implemented
MA0647 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,325 $30,000 Not Implemented
MA0647 # 03 Y:2009 03 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $458 $0 Not Implemented
MA0647 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,543 $1,200 Implemented
BD0346 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $833 $501 Implemented
BD0346 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $84,447 $2,972 Implemented
BD0346 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $893 $1,366 Not Implemented
BD0346 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,385 $10,001 Implemented
BD0346 # 07 Y:2008 07 2008 REPLACE BOILER $37,675 $65,001 Not Implemented
BD0346 # 08 Y:2008 08 2008 DIRECT WARMEST AIR TO COMBUSTION INTAKE $4,096 $1,251 Not Implemented
BD0346 # 09 Y:2008 09 2008 USE RADIANT HEATER FOR SPOT HEATING $19,119 $14,001 Not Implemented
BD0346 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $1,472 $676 Not Implemented
BD0346 # 03 Y:2008 03 2008 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,548 $4,569 Not Implemented
UM0336 # 03 Y:2008 03 2008 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $13,866 $29,119 Not Implemented
UM0336 # 05 Y:2008 05 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,239 $10,900 Not Implemented
UM0336 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,116 $200 Implemented
UM0336 # 08 Y:2008 08 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $2,766 $260 Not Implemented
UM0336 # 09 Y:2008 09 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $93 $93 Not Implemented
UM0336 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $6,297 $1,600 Implemented
UM0336 # 04 Y:2008 04 2008 REDUCE VENTILATION AIR $8,256 $2,001 Not Implemented
UM0336 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,330 $1,650 Implemented
UM0336 # 07 Y:2008 07 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,932 $1,000 Implemented
WV0375 # 15 Y:2008 15 2008 UPGRADE CONTROLS ON COMPRESSORS $7,595 $4,650 Not Implemented
WV0375 # 13 Y:2008 13 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $29,817 $2,000 Implemented
WV0375 # 09 Y:2008 09 2008 USE DEMAND CONTROLLER OR LOAD SHEDDER $57,494 $25,520 Not Implemented