IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

233

matching recommendations
Reset
SIC 3369 Nonferrous Foundries, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0325 # 02 Y:1995 02 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,067 $4,632 Not Implemented
MA0325 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,545 $2,500 Not Implemented
MA0325 # 04 Y:1995 04 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,557 $1,000 Implemented
MA0325 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $922 $0 Implemented
MA0325 # 06 Y:1995 06 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $453 $1,190 Implemented
MA0325 # 07 Y:1995 07 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $382 $0 Implemented
MA0325 # 08 Y:1995 08 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $378 $255 Implemented
MA0325 # 09 Y:1995 09 1995 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $28,487 $53,330 Implemented
MA0325 # 10 Y:1995 10 1995 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $7,953 $5,526 Implemented
CO0299 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,270 $450 Implemented
CO0299 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,120 $1,870 Implemented
CO0299 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,090 $1,660 Implemented
CO0299 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $880 $1,100 Not Implemented
CO0299 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $790 $460 Not Implemented
CO0299 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $690 $190 Implemented
CO0299 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $630 $180 Not Implemented
WV0008 # 01 Y:1993 01 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,872 $1,600 Not Implemented
WV0008 # 02 Y:1993 02 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $966 $582 Implemented
WV0008 # 03 Y:1993 03 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,773 $598 Implemented
WV0008 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $419 $576 Implemented
WV0008 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $100 $7,275 Implemented
WV0008 # 06 Y:1993 06 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $285 $0 Not Implemented
WV0008 # 07 Y:1993 07 1993 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $12,781 $408 Implemented
WV0008 # 08 Y:1993 08 1993 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $2,138 $2,057 Not Implemented
WV0008 # 09 Y:1993 09 1993 RECOVER WASTE HEAT FROM EQUIPMENT $1,407 $682 Not Implemented