Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 3369 Nonferrous Foundries, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0024 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,154 $3,000 Implemented
LM0024 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,155 $0 Implemented
LM0024 # 04 Y:2002 04 2002 IMPROVE COMBUSTION CONTROL CAPABILITY $3,312 $1,600 Not Implemented
LM0024 # 05 Y:2002 05 2002 CLEAR AND RENT EXISTING SPACE $110,000 $4,500 Implemented
LM0024 # 06 Y:2002 06 2002 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $237,600 $0 Implemented
LM0024 # 07 Y:2002 07 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $166,320 $100,000 Not Implemented
LM0024 # 08 Y:2002 08 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $47,320 $0 Not Implemented
LM0024 # 01 Y:2002 01 2002 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $7,010 $2,500 Implemented
SF0004 # 10 Y:1993 10 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $298 $158 Not Implemented
SF0004 # 09 Y:1993 09 1993 MOVE BOILER TO MORE EFFICIENT LOCATION $414 $639 Implemented
SF0004 # 08 Y:1993 08 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,308 $700 Implemented
SF0004 # 07 Y:1993 07 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,386 $1,800 Implemented
SF0004 # 06 Y:1993 06 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,881 $6,250 Implemented
SF0004 # 05 Y:1993 05 1993 INSULATE FEEDWATER TANK $1,488 $3,000 Implemented
SF0004 # 04 Y:1993 04 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,292 $20,600 Not Implemented
SF0004 # 03 Y:1993 03 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,565 $38,000 Implemented
SF0004 # 02 Y:1993 02 1993 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $48,223 $135,000 Not Implemented
SF0004 # 01 Y:1993 01 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $29,275 $20,000 Implemented