Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
18
matching recommendationsSIC | 3369 | Nonferrous Foundries, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0024 # 02 Y:2002 | 02 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,154 | $3,000 | Implemented |
LM0024 # 03 Y:2002 | 03 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,155 | $0 | Implemented |
LM0024 # 04 Y:2002 | 04 | 2002 | IMPROVE COMBUSTION CONTROL CAPABILITY | $3,312 | $1,600 | Not Implemented |
LM0024 # 05 Y:2002 | 05 | 2002 | CLEAR AND RENT EXISTING SPACE | $110,000 | $4,500 | Implemented |
LM0024 # 06 Y:2002 | 06 | 2002 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $237,600 | $0 | Implemented |
LM0024 # 07 Y:2002 | 07 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $166,320 | $100,000 | Not Implemented |
LM0024 # 08 Y:2002 | 08 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $47,320 | $0 | Not Implemented |
LM0024 # 01 Y:2002 | 01 | 2002 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $7,010 | $2,500 | Implemented |
SF0004 # 10 Y:1993 | 10 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $298 | $158 | Not Implemented |
SF0004 # 09 Y:1993 | 09 | 1993 | MOVE BOILER TO MORE EFFICIENT LOCATION | $414 | $639 | Implemented |
SF0004 # 08 Y:1993 | 08 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,308 | $700 | Implemented |
SF0004 # 07 Y:1993 | 07 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,386 | $1,800 | Implemented |
SF0004 # 06 Y:1993 | 06 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,881 | $6,250 | Implemented |
SF0004 # 05 Y:1993 | 05 | 1993 | INSULATE FEEDWATER TANK | $1,488 | $3,000 | Implemented |
SF0004 # 04 Y:1993 | 04 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,292 | $20,600 | Not Implemented |
SF0004 # 03 Y:1993 | 03 | 1993 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,565 | $38,000 | Implemented |
SF0004 # 02 Y:1993 | 02 | 1993 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $48,223 | $135,000 | Not Implemented |
SF0004 # 01 Y:1993 | 01 | 1993 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $29,275 | $20,000 | Implemented |