IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
SIC 339 Miscellaneous Primary Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1100 # 07 Y:2025 07 2025 INSTALL OCCUPANCY SENSORS $5,242 $7,768 n/a
UD1100 # 05 Y:2025 05 2025 OPTIMIZE PLANT POWER FACTOR $12,387 $23,400 n/a
UD1100 # 08 Y:2025 08 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,007 $15,430 n/a
UD1100 # 01 Y:2025 01 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $118 $0 n/a
UD1100 # 04 Y:2025 04 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,770 $1,235 n/a
UD1100 # 02 Y:2025 02 2025 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,520 $1,237 n/a
UD1100 # 03 Y:2025 03 2025 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $879 $0 n/a
UD1100 # 06 Y:2025 06 2025 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,587 $0 n/a
CW0117 # 02 Y:2020 02 2020 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $20,258 $28,161 Not Implemented
CW0117 # 05 Y:2020 05 2020 RECYCLE WHITE WATER $2,598 $6,039 Implemented
CW0117 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,860 $6,780 Implemented
CW0117 # 03 Y:2020 03 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $621 $1,288 Not Implemented
CW0117 # 04 Y:2020 04 2020 HEAT WATER WITH EXHAUST HEAT $1,331 $2,149 Implemented
CW0117 # 10 Y:2020 10 2020 RECOVER WASTE HEAT FROM EQUIPMENT $879 $5,742 Implemented
CW0117 # 06 Y:2020 06 2020 USE A DIFFERENT OR RECYCLED RAW MATERIAL $217,090 $846,410 Implemented
CW0117 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,334 $255 Implemented
CW0117 # 08 Y:2020 08 2020 UPGRADE CONTROLS ON COMPRESSORS $11,576 $32,850 Not Implemented
CW0117 # 09 Y:2020 09 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,222 $15,730 Not Implemented
UD0962 # 02 Y:2017 02 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,791 $211,700 Implemented
UD0962 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $7,630 $8,990 Implemented
UD0962 # 04 Y:2017 04 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,906 $23,600 Not Implemented
UD0962 # 03 Y:2017 03 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,226 $3,000 Not Implemented
UD0962 # 05 Y:2017 05 2017 INSTALL AUTOMATIC STACK DAMPER $847 $1,050 Not Implemented
UD0962 # 01 Y:2017 01 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $452 $300 Not Implemented
UD0962 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,115 $20,000 Not Implemented