IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,058

matching recommendations
Reset
SIC 339 Miscellaneous Primary Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0263 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,354 $121 Not Implemented
SU0263 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,614 $408 Implemented
SU0263 # 07 Y:2008 07 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $230 $258 Implemented
SU0263 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $307 $474 Implemented
SU0263 # 09 Y:2008 09 2008 REDUCE VENTILATION AIR $1,611 $13,919 Not Implemented
MA0625 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,463 $31,000 Not Implemented
MA0625 # 02 Y:2007 02 2007 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,935 $8,000 Implemented
MA0625 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,861 $14,400 Not Implemented
MA0625 # 04 Y:2007 04 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $5,881 $0 Not Implemented
MA0625 # 05 Y:2007 05 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,964 $10,530 Implemented
LE0261 # 01 Y:2007 01 2007 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $196,792 $500 Not Implemented
LE0261 # 02 Y:2007 02 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $71,526 $75,000 Not Implemented
LE0261 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,454 $12,000 Not Implemented
LE0261 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,461 $20 Implemented
LE0261 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,661 $100 Implemented
LE0261 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $7,137 $5,000 Not Implemented
LE0261 # 07 Y:2007 07 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,155 $1,500 Implemented
LE0261 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,476 $150 Implemented
LE0261 # 09 Y:2007 09 2007 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,985 $300 Not Implemented
UD0744 # 01 Y:2006 01 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $67,027 $1,500 Not Implemented
UD0744 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $60,139 $400,400 Not Implemented
UD0744 # 03 Y:2006 03 2006 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $29,099 $50,000 Not Implemented
UD0744 # 04 Y:2006 04 2006 USE OPTIMUM THICKNESS INSULATION $24,529 $14,670 Not Implemented
UD0744 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,118 $33,800 Not Implemented
UD0744 # 06 Y:2006 06 2006 USE OPTIMUM THICKNESS INSULATION $17,062 $7,053 Not Implemented