Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,047
matching recommendationsSIC | 339 | Miscellaneous Primary Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0205 # 01 Y:2005 | 01 | 2005 | INSTALL BACK-UP EQUIPMENT | $65,962 | $35,000 | Implemented |
LE0205 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,462 | $15,000 | Not Implemented |
LE0205 # 03 Y:2005 | 03 | 2005 | OPTIMIZE PLANT POWER FACTOR | $4,673 | $5,050 | Not Implemented |
LE0205 # 04 Y:2005 | 04 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,294 | $2,500 | Implemented |
LE0205 # 05 Y:2005 | 05 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,527 | $300 | Not Implemented |
LE0205 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,521 | $150 | Implemented |
NC0303 # 01 Y:2004 | 01 | 2004 | ADOPT IN-HOUSE MATERIAL GENERATION | $34,730 | $120,000 | Not Implemented |
NC0303 # 02 Y:2004 | 02 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $20,788 | $0 | Not Implemented |
NC0303 # 03 Y:2004 | 03 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $18,426 | $18,825 | Not Implemented |
NC0303 # 04 Y:2004 | 04 | 2004 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $11,844 | $18,280 | Not Implemented |
NC0303 # 05 Y:2004 | 05 | 2004 | REDESIGN PROCESS | $73,700 | $35,000 | Not Implemented |
NC0303 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,224 | $100 | Implemented |
NC0303 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,085 | $1,385 | Not Implemented |
SF0289 # 01 Y:2004 | 01 | 2004 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,527 | $2,527 | Implemented |
SF0289 # 02 Y:2004 | 02 | 2004 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $956 | $180 | Implemented |
SF0289 # 03 Y:2004 | 03 | 2004 | INSTALL OCCUPANCY SENSORS | $1,280 | $1,280 | Not Implemented |
SF0289 # 04 Y:2004 | 04 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $864 | $1,183 | Not Implemented |
SF0289 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,525 | $12,060 | Not Implemented |
SF0289 # 06 Y:2004 | 06 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $270 | $885 | Implemented |
SF0289 # 07 Y:2004 | 07 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,506 | $6,000 | Not Implemented |
SF0289 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,750 | $6,748 | Implemented |
SF0289 # 09 Y:2004 | 09 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $449 | $960 | Not Implemented |
SF0289 # 10 Y:2004 | 10 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $7,873 | $100 | Not Implemented |
LM0074 # 01 Y:2004 | 01 | 2004 | INSULATE BARE EQUIPMENT | $3,094 | $231 | Implemented |
LM0074 # 02 Y:2004 | 02 | 2004 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,288 | $1,000 | Implemented |