IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,029

matching recommendations
Reset
SIC 339 Miscellaneous Primary Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0053 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,275 $5,730 Implemented
AM0053 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48 $11 Implemented
AM0053 # 04 Y:1989 04 1989 INSTALL SET-BACK TIMERS $250 $50 Implemented
AM0053 # 05 Y:1989 05 1989 INSTALL SET-BACK TIMERS $205 $0 Not Implemented
AM0053 # 06 Y:1989 06 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $115 $300 Implemented
UD0227 # 01 Y:1987 01 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $26,035 $30,000 Implemented
UD0227 # 02 Y:1987 02 1987 OPTIMIZE PLANT POWER FACTOR $4,712 $12,000 Implemented
UD0227 # 03 Y:1987 03 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,245 $0 Not Implemented
UD0227 # 04 Y:1987 04 1987 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $534 $6,000 Implemented
UD0227 # 05 Y:1987 05 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,752 $0 Not Implemented
LT0072 # 01 Y:1986 01 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $138,229 $20,020 Not Implemented
LT0072 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $115 $58 Implemented
LT0072 # 03 Y:1986 03 1986 INSTALL SET-BACK TIMERS $2,358 $0 Implemented
LT0072 # 04 Y:1986 04 1986 INSTALL TIMERS AND/OR THERMOSTATS $962 $450 Implemented
LT0072 # 05 Y:1986 05 1986 COVER OPEN TANKS $5,148 $2,840 Not Implemented
ST0080 # 01 Y:1986 01 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,901 $59,000 Not Implemented
ST0080 # 02 Y:1986 02 1986 RECOVER WASTE HEAT FROM EQUIPMENT $9,482 $7,000 Implemented
ST0080 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,370 $0 Implemented
ST0080 # 04 Y:1986 04 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $531 $1,333 Implemented
ST0080 # 05 Y:1986 05 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,206 $558 Implemented
ST0080 # 06 Y:1986 06 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,264 $2,016 Implemented
ST0080 # 07 Y:1986 07 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,682 $6,000 Not Implemented
AT0045 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,281 $4,444 Implemented
AT0045 # 02 Y:1986 02 1986 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $12,817 $2,000 Not Implemented
AT0045 # 03 Y:1986 03 1986 INSULATE BARE EQUIPMENT $2,194 $100 Implemented