Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
101
matching recommendationsSIC | 339 | Miscellaneous Primary Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1100 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $5,242 | $7,768 | n/a |
UD1100 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $12,387 | $23,400 | n/a |
UD1100 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,007 | $15,430 | n/a |
UD1100 # 01 Y:2025 | 01 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $118 | $0 | n/a |
UD1100 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,770 | $1,235 | n/a |
UD1100 # 02 Y:2025 | 02 | 2025 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,520 | $1,237 | n/a |
UD1100 # 03 Y:2025 | 03 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $879 | $0 | n/a |
UD1100 # 06 Y:2025 | 06 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,587 | $0 | n/a |
CW0117 # 02 Y:2020 | 02 | 2020 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $20,258 | $28,161 | Not Implemented |
CW0117 # 05 Y:2020 | 05 | 2020 | RECYCLE WHITE WATER | $2,598 | $6,039 | Implemented |
CW0117 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,860 | $6,780 | Implemented |
CW0117 # 03 Y:2020 | 03 | 2020 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $621 | $1,288 | Not Implemented |
CW0117 # 04 Y:2020 | 04 | 2020 | HEAT WATER WITH EXHAUST HEAT | $1,331 | $2,149 | Implemented |
CW0117 # 10 Y:2020 | 10 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $879 | $5,742 | Implemented |
CW0117 # 06 Y:2020 | 06 | 2020 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $217,090 | $846,410 | Implemented |
CW0117 # 07 Y:2020 | 07 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,334 | $255 | Implemented |
CW0117 # 08 Y:2020 | 08 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $11,576 | $32,850 | Not Implemented |
CW0117 # 09 Y:2020 | 09 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,222 | $15,730 | Not Implemented |
UD0962 # 02 Y:2017 | 02 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $7,791 | $211,700 | Implemented |
UD0962 # 07 Y:2017 | 07 | 2017 | INSTALL OCCUPANCY SENSORS | $7,630 | $8,990 | Implemented |
UD0962 # 04 Y:2017 | 04 | 2017 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $5,906 | $23,600 | Not Implemented |
UD0962 # 03 Y:2017 | 03 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,226 | $3,000 | Not Implemented |
UD0962 # 05 Y:2017 | 05 | 2017 | INSTALL AUTOMATIC STACK DAMPER | $847 | $1,050 | Not Implemented |
UD0962 # 01 Y:2017 | 01 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $452 | $300 | Not Implemented |
UD0962 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,115 | $20,000 | Not Implemented |