IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

587

matching recommendations
Reset
SIC 3398 Metal Heat Treating
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0744 # 01 Y:2006 01 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $67,027 $1,500 Not Implemented
UD0744 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $60,139 $400,400 Not Implemented
UD0744 # 03 Y:2006 03 2006 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $29,099 $50,000 Not Implemented
UD0744 # 04 Y:2006 04 2006 USE OPTIMUM THICKNESS INSULATION $24,529 $14,670 Not Implemented
UD0744 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,118 $33,800 Not Implemented
UD0744 # 06 Y:2006 06 2006 USE OPTIMUM THICKNESS INSULATION $17,062 $7,053 Not Implemented
UD0744 # 07 Y:2006 07 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $15,843 $3,000 Not Implemented
UD0744 # 08 Y:2006 08 2006 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,657 $1,195 Not Implemented
UD0744 # 09 Y:2006 09 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $731 $0 Not Implemented
UF0374 # 01 Y:2006 01 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $22,510 $54,165 Not Implemented
UF0374 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $43,329 $868 Implemented
UF0374 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,278 $12,817 Implemented
UF0374 # 04 Y:2006 04 2006 IMPROVE SPACE COMFORT CONDITIONING $6,479 $13,400 Not Implemented
UF0374 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,506 $4,360 Implemented
UF0374 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,005 $1,355 Implemented
UF0374 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,895 $1,653 Implemented
UF0374 # 08 Y:2006 08 2006 INSTALL SKYLIGHTS $1,181 $9,627 Not Implemented
UF0374 # 09 Y:2006 09 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,339 $24,500 Not Implemented
UF0374 # 10 Y:2006 10 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,016 $0 Implemented
UM0294 # 01 Y:2005 01 2005 COVER OPEN TANKS $48,559 $7,232 Not Implemented
UM0294 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,274 $600 Not Implemented
UM0294 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,684 $4,536 Not Implemented
UM0294 # 04 Y:2005 04 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,051 $2,400 Not Implemented
UM0294 # 05 Y:2005 05 2005 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,604 $3,000 Not Implemented
UM0294 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $1,231 $1,344 Not Implemented