Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
19
matching recommendationsSIC | 3398 | Metal Heat Treating |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0176 # 06 Y:2000 | 06 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $425,187 | $800,000 | Not Implemented |
UM0176 # 05 Y:2000 | 05 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $51,717 | $8,050 | Not Implemented |
UM0176 # 04 Y:2000 | 04 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $127,531 | $162,750 | Not Implemented |
UM0176 # 03 Y:2000 | 03 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,038 | $2,201 | Not Implemented |
UM0176 # 02 Y:2000 | 02 | 2000 | INCREASE AMOUNT OF CONDENSATE RETURNED | $72,582 | $15,000 | Not Implemented |
UM0176 # 01 Y:2000 | 01 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $733 | $500 | Not Implemented |
UM0162 # 04 Y:2000 | 04 | 2000 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $15,894 | $12,000 | Implemented |
UM0162 # 07 Y:2000 | 07 | 2000 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $12,510 | $24,650 | Implemented |
UM0162 # 06 Y:2000 | 06 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $18,858 | $36,000 | Implemented |
UM0162 # 05 Y:2000 | 05 | 2000 | INSTALL AUTOMATIC STACK DAMPER | $576 | $720 | Implemented |
UM0162 # 03 Y:2000 | 03 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,628 | $10,800 | Implemented |
UM0162 # 02 Y:2000 | 02 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $15,362 | $10,000 | Implemented |
UM0162 # 01 Y:2000 | 01 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,699 | $50 | Not Implemented |
MA0463 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $203,441 | $1,320,000 | Not Implemented |
MA0463 # 06 Y:2000 | 06 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $240 | $420 | Implemented |
MA0463 # 05 Y:2000 | 05 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,745 | $4,317 | Implemented |
MA0463 # 04 Y:2000 | 04 | 2000 | OPTIMIZE PLANT POWER FACTOR | $3,291 | $9,600 | Not Implemented |
MA0463 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,123 | $12,075 | Not Implemented |
MA0463 # 02 Y:2000 | 02 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $25,420 | $120,000 | Implemented |