IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

458

matching recommendations
Reset
SIC 3399 Primary Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0325 # 11 Y:2025 11 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $149 $144 n/a
IC0325 # 01 Y:2025 01 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $34,094 $58,119 n/a
IC0325 # 07 Y:2025 07 2025 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $2,149 $5,256 n/a
IC0325 # 06 Y:2025 06 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,350 $246 n/a
IC0325 # 04 Y:2025 04 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,318 $7,240 n/a
IC0325 # 05 Y:2025 05 2025 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $4,795 $3,414 n/a
IC0325 # 02 Y:2025 02 2025 INSTALL EFFICIENT RECTIFIERS $8,079 $8,129 n/a
IC0325 # 10 Y:2025 10 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,175 $2,940 n/a
IC0325 # 09 Y:2025 09 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,137 $0 n/a
IC0325 # 03 Y:2025 03 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,138 $5,309 n/a
IC0325 # 08 Y:2025 08 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,716 $0 n/a
OR0789 # 03 Y:2024 03 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $4,115 $1,800 Not Implemented
OR0789 # 02 Y:2024 02 2024 OPTIMIZE PLANT POWER FACTOR $1,616 $14,338 Not Implemented
OR0789 # 04 Y:2024 04 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $985 $0 Implemented
OR0789 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,513 $0 Implemented
OR0789 # 05 Y:2024 05 2024 INSTALL COMMON HEADER ON COMPRESSORS $16,245 $4,904 Not Implemented
CI0025 # 01 Y:2023 01 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $81,464 $500,000 n/a
CI0025 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $63,063 $212,582 n/a
CI0025 # 03 Y:2023 03 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,140 $17,500 n/a
CI0025 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,867 $7,205 n/a
CI0025 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,405 $0 n/a
CI0025 # 06 Y:2023 06 2023 USE PHOTOCELL CONTROLS $2,875 $2,520 n/a
CI0025 # 07 Y:2023 07 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,793 $100 n/a
IP0179 # 07 Y:2023 07 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $378 $3,830 Not Implemented
IP0179 # 06 Y:2023 06 2023 USE HEAT PUMP FOR SPACE CONDITIONING $26,133 $46,106 Not Implemented