Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
458
matching recommendationsSIC | 3399 | Primary Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0325 # 11 Y:2025 | 11 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $149 | $144 | n/a |
IC0325 # 01 Y:2025 | 01 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $34,094 | $58,119 | n/a |
IC0325 # 07 Y:2025 | 07 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $2,149 | $5,256 | n/a |
IC0325 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,350 | $246 | n/a |
IC0325 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,318 | $7,240 | n/a |
IC0325 # 05 Y:2025 | 05 | 2025 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $4,795 | $3,414 | n/a |
IC0325 # 02 Y:2025 | 02 | 2025 | INSTALL EFFICIENT RECTIFIERS | $8,079 | $8,129 | n/a |
IC0325 # 10 Y:2025 | 10 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,175 | $2,940 | n/a |
IC0325 # 09 Y:2025 | 09 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,137 | $0 | n/a |
IC0325 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,138 | $5,309 | n/a |
IC0325 # 08 Y:2025 | 08 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,716 | $0 | n/a |
OR0789 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $4,115 | $1,800 | Not Implemented |
OR0789 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $1,616 | $14,338 | Not Implemented |
OR0789 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $985 | $0 | Implemented |
OR0789 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,513 | $0 | Implemented |
OR0789 # 05 Y:2024 | 05 | 2024 | INSTALL COMMON HEADER ON COMPRESSORS | $16,245 | $4,904 | Not Implemented |
CI0025 # 01 Y:2023 | 01 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $81,464 | $500,000 | n/a |
CI0025 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $63,063 | $212,582 | n/a |
CI0025 # 03 Y:2023 | 03 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,140 | $17,500 | n/a |
CI0025 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,867 | $7,205 | n/a |
CI0025 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,405 | $0 | n/a |
CI0025 # 06 Y:2023 | 06 | 2023 | USE PHOTOCELL CONTROLS | $2,875 | $2,520 | n/a |
CI0025 # 07 Y:2023 | 07 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,793 | $100 | n/a |
IP0179 # 07 Y:2023 | 07 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $378 | $3,830 | Not Implemented |
IP0179 # 06 Y:2023 | 06 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $26,133 | $46,106 | Not Implemented |