Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
447
matching recommendationsSIC | 3399 | Primary Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0789 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $985 | $0 | Implemented |
OR0789 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $4,115 | $1,800 | Not Implemented |
OR0789 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,513 | $0 | Implemented |
OR0789 # 05 Y:2024 | 05 | 2024 | INSTALL COMMON HEADER ON COMPRESSORS | $16,245 | $4,904 | Not Implemented |
OR0789 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $1,616 | $14,338 | Not Implemented |
CI0025 # 07 Y:2023 | 07 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,793 | $100 | n/a |
CI0025 # 06 Y:2023 | 06 | 2023 | USE PHOTOCELL CONTROLS | $2,875 | $2,520 | n/a |
CI0025 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,405 | $0 | n/a |
CI0025 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,867 | $7,205 | n/a |
CI0025 # 03 Y:2023 | 03 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,140 | $17,500 | n/a |
CI0025 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $63,063 | $212,582 | n/a |
CI0025 # 01 Y:2023 | 01 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $81,464 | $500,000 | n/a |
IP0179 # 07 Y:2023 | 07 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $378 | $3,830 | Not Implemented |
IP0179 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,534 | $182 | Not Implemented |
IP0179 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $814 | $9 | Not Implemented |
IP0179 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $19,788 | $345 | Not Implemented |
IP0179 # 02 Y:2023 | 02 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,855 | $0 | Not Implemented |
IP0179 # 06 Y:2023 | 06 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $26,133 | $46,106 | Not Implemented |
IP0179 # 01 Y:2023 | 01 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $471 | $0 | Not Implemented |
MU0024 # 02 Y:2023 | 02 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $11,030 | $122,000 | Not Implemented |
MU0024 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,238 | $4,250 | Implemented |
MU0024 # 05 Y:2023 | 05 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $203 | $76 | Implemented |
MU0024 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,863 | $294,000 | Implemented |
MU0024 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $247 | $260 | Not Implemented |
SD0624 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,107 | $5,169 | Not Implemented |