Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsSIC | 3399 | Primary Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0364 # 01 Y:1996 | 01 | 1996 | ADOPT IN-HOUSE MATERIAL GENERATION | $20,546 | $119,500 | Not Implemented |
MA0364 # 10 Y:1996 | 10 | 1996 | INSTALL OCCUPANCY SENSORS | $171 | $237 | Not Implemented |
MA0364 # 09 Y:1996 | 09 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $297 | $0 | Implemented |
MA0364 # 08 Y:1996 | 08 | 1996 | REDUCE VENTILATION AIR | $360 | $0 | Not Implemented |
MA0364 # 07 Y:1996 | 07 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $477 | $1,100 | Implemented |
MA0364 # 06 Y:1996 | 06 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $755 | $4,800 | Not Implemented |
MA0364 # 05 Y:1996 | 05 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,454 | $900 | Not Implemented |
MA0364 # 04 Y:1996 | 04 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,606 | $0 | Not Implemented |
MA0364 # 03 Y:1996 | 03 | 1996 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $652 | $12,000 | Not Implemented |
MA0364 # 02 Y:1996 | 02 | 1996 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $5,996 | $2,009 | Not Implemented |
MA0283 # 07 Y:1993 | 07 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $335 | $0 | Not Implemented |
MA0283 # 06 Y:1993 | 06 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $371 | $400 | Implemented |
MA0283 # 05 Y:1993 | 05 | 1993 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $548 | $151 | Implemented |
MA0283 # 04 Y:1993 | 04 | 1993 | INSTALL OCCUPANCY SENSORS | $596 | $710 | Not Implemented |
MA0283 # 03 Y:1993 | 03 | 1993 | RECOVER AND REUSE COOLING WATER | $1,407 | $200 | Implemented |
MA0283 # 02 Y:1993 | 02 | 1993 | OPTIMIZE PLANT POWER FACTOR | $3,380 | $6,000 | Implemented |
MA0283 # 01 Y:1993 | 01 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,690 | $435 | Implemented |
MA0018 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,776 | $450 | Implemented |
MA0018 # 03 Y:1985 | 03 | 1985 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $12,935 | $31,465 | Implemented |
MA0018 # 02 Y:1985 | 02 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,840 | $756 | Implemented |