IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0051 # 06 Y:1982 06 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29 $13 Implemented
OK0051 # 05 Y:1982 05 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $130 $0 Implemented
OK0051 # 02 Y:1982 02 1982 RECOVER WASTE HEAT FROM EQUIPMENT $3,675 $3,000 Implemented
OK0051 # 01 Y:1982 01 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,367 $200 Implemented
OK0046 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,800 $148 Implemented
KU0059 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,516 $22,000 Implemented
KU0059 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,363 $120 Implemented
KU0059 # 05 Y:1982 05 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,405 $99 Implemented
GT0128 # 01 Y:1982 01 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,768 $500 Implemented
GT0128 # 02 Y:1982 02 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $4,227 $2,513 Implemented
GT0128 # 03 Y:1982 03 1982 USE MINIMUM SAFE OVEN VENTILATION $4,221 $22 Implemented
GT0128 # 04 Y:1982 04 1982 REPAIR AND ELIMINATE STEAM LEAKS $1,084 $180 Implemented
GT0128 # 05 Y:1982 05 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,142 $150 Implemented
OK0057 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,500 $500 Implemented
OK0057 # 03 Y:1982 03 1982 OPTIMIZE PLANT POWER FACTOR $20,704 $36,360 Implemented
OK0057 # 05 Y:1982 05 1982 COVER OPEN TANKS $640 $655 Implemented
OK0057 # 06 Y:1982 06 1982 INSTALL TIMERS AND/OR THERMOSTATS $4,092 $1,100 Implemented
TN0118 # 01 Y:1982 01 1982 COVER OPEN TANKS $1,586 $120 Implemented
TN0118 # 02 Y:1982 02 1982 INSULATE BARE EQUIPMENT $309 $630 Implemented
TN0118 # 03 Y:1982 03 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,880 $400 Implemented
UD0025 # 03 Y:1982 03 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $162 $0 Implemented
KU0035 # 05 Y:1982 05 1982 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $8,165 $22,000 Implemented
KU0035 # 04 Y:1982 04 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,265 $535 Implemented
OK0018 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,010 $9,000 Implemented
OK0018 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $594 $850 Implemented