IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,254

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0538 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,115 $253 Implemented
TN0538 # 06 Y:1995 06 1995 OPTIMIZE PLANT POWER FACTOR $4,892 $5,000 Implemented
MA0321 # 01 Y:1995 01 1995 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $22,525 $60,000 Implemented
MA0321 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,493 $23,880 Implemented
TN0537 # 01 Y:1995 01 1995 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $16,330 $2,190 Implemented
TN0537 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $740 $224 Implemented
UF0108 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $221 $160 Implemented
UF0108 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,776 $4,557 Implemented
UF0108 # 04 Y:1995 04 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $37,107 $7,595 Implemented
UF0108 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,516 $9,616 Implemented
UF0108 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,073 $2,000 Implemented
UF0108 # 08 Y:1995 08 1995 CONVERT TO AQUEOUS CLEANING SYSTEM $36,907 $18,000 Implemented
WI0222 # 02 Y:1994 02 1994 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,553 $1,500 Implemented
WI0222 # 04 Y:1994 04 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,038 $850 Implemented
WI0222 # 06 Y:1994 06 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $444 $0 Implemented
AR0044 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,019 $565 Implemented
AR0044 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $588 $385 Implemented
AR0044 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $278 $100 Implemented
AR0044 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $559 $100 Implemented
AR0044 # 05 Y:1994 05 1994 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $196 $20 Implemented
CO0318 # 02 Y:1994 02 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,830 $7,860 Implemented
CO0318 # 04 Y:1994 04 1994 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $2,210 $1,750 Implemented
CO0318 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,590 $2,260 Implemented
CO0318 # 08 Y:1994 08 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $880 $370 Implemented
CO0318 # 09 Y:1994 09 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $560 $960 Implemented