IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,254

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0040 # 03 Y:1991 03 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,134 $2,543 Implemented
AS0040 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,889 $1,000 Implemented
AS0040 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,948 $0 Implemented
AS0040 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,041 $500 Implemented
AS0040 # 07 Y:1991 07 1991 UPGRADE OBSOLETE EQUIPMENT $10,456 $0 Implemented
AS0040 # 08 Y:1991 08 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,777 $555 Implemented
AS0040 # 09 Y:1991 09 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $537 $776 Implemented
AS0040 # 10 Y:1991 10 1991 INSTALL SET-BACK TIMERS $3,044 $900 Implemented
AS0040 # 11 Y:1991 11 1991 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $190,214 $0 Implemented
AS0040 # 12 Y:1991 12 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,916 $2,500 Implemented
AS0040 # 13 Y:1991 13 1991 INSULATE BARE EQUIPMENT $33,741 $18,360 Implemented
AS0040 # 14 Y:1991 14 1991 INSULATE BARE EQUIPMENT $152 $165 Implemented
HO0008 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $631 $1,032 Implemented
HO0008 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,973 $742 Implemented
HO0008 # 03 Y:1991 03 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,555 $0 Implemented
HO0008 # 04 Y:1991 04 1991 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $235,098 $0 Implemented
GT0446 # 01 Y:1991 01 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,430 $0 Implemented
GT0446 # 02 Y:1991 02 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $439 $140 Implemented
GT0446 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,377 $0 Implemented
GT0446 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $120 $30 Implemented
GT0446 # 05 Y:1991 05 1991 INSTALL TIMERS AND/OR THERMOSTATS $18,000 $300 Implemented
GT0446 # 06 Y:1991 06 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $80 $130 Implemented
GT0446 # 07 Y:1991 07 1991 COVER OPEN TANKS $9,880 $7,550 Implemented
KU0351 # 01 Y:1991 01 1991 INSTALL TIMERS AND/OR THERMOSTATS $5,020 $3,380 Implemented
KU0351 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,664 $744 Implemented