IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,274

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0110 # 07 Y:1991 07 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $542 $162 Implemented
RU0111 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,414 $0 Implemented
RU0111 # 02 Y:1991 02 1991 IMPROVE LUBRICATION PRACTICES $5,665 $800 Implemented
RU0111 # 03 Y:1991 03 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,080 $8,122 Implemented
RU0111 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,330 $340 Implemented
RU0111 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $475 $0 Implemented
RU0113 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,496 $0 Implemented
RU0113 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,138 $330 Implemented
RU0113 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,196 $1,735 Implemented
RU0113 # 04 Y:1991 04 1991 COVER OPEN TANKS $506 $1,164 Implemented
RU0113 # 05 Y:1991 05 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,454 $0 Implemented
RU0113 # 06 Y:1991 06 1991 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $17,916 $11,500 Implemented
RU0113 # 07 Y:1991 07 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,091 $500 Implemented
RU0113 # 08 Y:1991 08 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,756 $6,800 Implemented
KU0335 # 01 Y:1991 01 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,716 $0 Implemented
KU0335 # 02 Y:1991 02 1991 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $6,430 $0 Implemented
KU0335 # 03 Y:1991 03 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,755 $1,500 Implemented
KU0335 # 04 Y:1991 04 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,018 $0 Implemented
KU0335 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $641 $300 Implemented
KU0335 # 06 Y:1991 06 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $590 $0 Implemented
KU0335 # 07 Y:1991 07 1991 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $369 $300 Implemented
KU0335 # 08 Y:1991 08 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $408 $388 Implemented
UD0339 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,489 $0 Implemented
UD0339 # 02 Y:1991 02 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,089 $0 Implemented
UD0339 # 03 Y:1991 03 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $678 $5,000 Implemented