IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,274

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0087 # 03 Y:1983 03 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,133 $250 Implemented
KU0083 # 03 Y:1983 03 1983 INSTALL TIMERS AND/OR THERMOSTATS $3,583 $200 Implemented
KU0073 # 02 Y:1983 02 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,086 $3,279 Implemented
KU0073 # 05 Y:1983 05 1983 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $3,151 $1,000 Implemented
KU0073 # 06 Y:1983 06 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,265 $0 Implemented
KU0073 # 07 Y:1983 07 1983 OPTIMIZE PLANT POWER FACTOR $2,135 $2,485 Implemented
KU0073 # 08 Y:1983 08 1983 INSTALL AUTOMATIC STACK DAMPER $1,787 $1,544 Implemented
KU0073 # 09 Y:1983 09 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,117 $1,100 Implemented
KU0073 # 10 Y:1983 10 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $516 $67 Implemented
KU0078 # 02 Y:1983 02 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,257 $167 Implemented
KU0078 # 03 Y:1983 03 1983 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,380 $0 Implemented
KU0078 # 04 Y:1983 04 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,470 $78 Implemented
KU0078 # 05 Y:1983 05 1983 INSTALL AUTOMATIC STACK DAMPER $1,100 $480 Implemented
UD0077 # 02 Y:1983 02 1983 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,987 $2,000 Implemented
UD0077 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,967 $500 Implemented
TN0163 # 03 Y:1982 03 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $500 $0 Implemented
OK0064 # 01 Y:1982 01 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $707 $56 Implemented
OK0064 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $1,830 $400 Implemented
OK0064 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,330 $1,405 Implemented
OK0064 # 04 Y:1982 04 1982 INSTALL TIMERS AND/OR THERMOSTATS $1,749 $560 Implemented
OK0064 # 05 Y:1982 05 1982 INSTALL TIMERS AND/OR THERMOSTATS $485 $0 Implemented
OK0064 # 06 Y:1982 06 1982 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $586 $0 Implemented
UD0060 # 02 Y:1982 02 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,089 $1,000 Implemented
UD0060 # 04 Y:1982 04 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,230 $46,000 Implemented
UD0060 # 05 Y:1982 05 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $618 $0 Implemented