IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

229

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0468 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,758 $728 Implemented
TN0468 # 04 Y:1992 04 1992 KEEP LAMPS AND REFLECTORS CLEAN $608 $120 Implemented
TN0468 # 05 Y:1992 05 1992 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $388 $720 Implemented
TN0468 # 06 Y:1992 06 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $198 $25 Implemented
UD0373 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $6,664 $8,600 Implemented
UD0373 # 02 Y:1992 02 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,724 $0 Implemented
UD0373 # 04 Y:1992 04 1992 METER WASTE WATER $14,996 $300,000 Implemented
UF0035 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $208 $514 Implemented
UF0035 # 02 Y:1992 02 1992 INSTALL SPECTRAL REFLECTORS / DELAMP $3,537 $6,210 Implemented
UF0035 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $94 $1,630 Implemented
OK0381 # 01 Y:1992 01 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,587 $150 Implemented
OK0381 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $374 $1,389 Implemented
OK0381 # 03 Y:1992 03 1992 RECOVER WASTE HEAT FROM EQUIPMENT $11,360 $1,185 Implemented
CO0246 # 01 Y:1992 01 1992 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,100 $250 Implemented
CO0246 # 02 Y:1992 02 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $820 $5 Implemented
CO0246 # 03 Y:1992 03 1992 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,120 $1,300 Implemented
CO0246 # 04 Y:1992 04 1992 INSTALL TIMERS AND/OR THERMOSTATS $190 $10 Implemented
CO0246 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,500 $29,730 Implemented
CO0246 # 06 Y:1992 06 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $190 $10 Implemented
CO0246 # 07 Y:1992 07 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $360 $310 Implemented
CO0246 # 09 Y:1992 09 1992 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $310 $1,500 Implemented
OK0379 # 01 Y:1992 01 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $854 $0 Implemented
OK0379 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,182 $200 Implemented
OK0379 # 03 Y:1992 03 1992 INSULATE BARE EQUIPMENT $89 $108 Implemented
OK0379 # 04 Y:1992 04 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,070 $2,500 Implemented