IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0140 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,837 $642 Implemented
BS0140 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,952 $4,513 Implemented
BS0140 # 02 Y:2020 02 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $466 $319 Implemented
BS0140 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,058 $0 Implemented
BS0063 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $260 $208 Implemented
BS0063 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $143 $357 Implemented
BS0063 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,150 $1,124 Implemented
BS0063 # 05 Y:2015 05 2015 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $3,476 $12,265 Implemented
BS0063 # 07 Y:2015 07 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,883 $503 Implemented
BS0048 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,298 $28,509 Implemented
BS0048 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,926 $9,550 Implemented
BS0048 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,403 $5,220 Implemented
BS0048 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $1,969 $3,083 Implemented
BS0048 # 07 Y:2015 07 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $965 $175 Implemented
BS0048 # 08 Y:2015 08 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $168 $805 Implemented
BS0048 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $406 $722 Implemented
BS0023 # 02 Y:2013 02 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,676 $986 Implemented
BS0023 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $49 $161 Implemented
BS0023 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $983 $2,950 Implemented
BS0023 # 01 Y:2013 01 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,128 $10 Implemented
OR0523 # 01 Y:2007 01 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $35,000 $60,000 Implemented
OR0523 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $1,220 $1,160 Implemented
UU0056 # 06 Y:2003 06 2003 RECOVER WASTE HEAT FROM EQUIPMENT $110 $490 Implemented
UU0056 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $244 $58 Implemented
UU0056 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $325 $121 Implemented