IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0284 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,090 $15,253 Implemented
ME0284 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,586 $8,987 Implemented
ME0245 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,163 $5,970 Implemented
ME0245 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,398 $400 Implemented
ME0245 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,696 $0 Implemented
ME0245 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,127 $3,000 Implemented
ME0245 # 05 Y:1998 05 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,051 $2,000 Implemented
ME0245 # 06 Y:1998 06 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $895 $700 Implemented
ME0245 # 07 Y:1998 07 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $803 $900 Implemented
ME0245 # 10 Y:1998 10 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $443 $174 Implemented
ME0191 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $2,594 $1,530 Implemented
ME0191 # 09 Y:1996 09 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $782 $10,247 Implemented
ME0191 # 08 Y:1996 08 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $783 $1,200 Implemented
ME0191 # 07 Y:1996 07 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $848 $200 Implemented
ME0191 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,191 $4,542 Implemented
ME0191 # 05 Y:1996 05 1996 INSTALL TIMERS AND/OR THERMOSTATS $1,984 $2,400 Implemented
ME0191 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,679 $600 Implemented
ME0191 # 03 Y:1996 03 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,670 $1,070 Implemented
ME0187 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,346 $5,000 Implemented
ME0187 # 03 Y:1996 03 1996 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $2,188 $180 Implemented
ME0187 # 04 Y:1996 04 1996 INSULATE BARE EQUIPMENT $938 $195 Implemented
ME0187 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $617 $700 Implemented
ME0187 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $345 $800 Implemented
ME0187 # 08 Y:1996 08 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $14,359 $10,247 Implemented
ME0187 # 09 Y:1996 09 1996 MINIMIZE WATER USAGE $4,135 $20,220 Implemented