IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0732 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,620 $12,560 n/a
CO0732 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,070 $46,190 n/a
CO0732 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,690 $840 n/a
CO0656 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,020 $6,960 Not Implemented
CO0656 # 05 Y:2012 05 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,280 $260 Implemented
CO0656 # 04 Y:2012 04 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,530 $4,000 Implemented
CO0656 # 03 Y:2012 03 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,620 $62,400 Not Implemented
CO0656 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,770 $53,300 Implemented
CO0656 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,170 $630 Implemented
CO0595 # 04 Y:2006 04 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $3,950 $630 Not Implemented
CO0595 # 09 Y:2006 09 2006 USE SOLAR HEAT TO HEAT MAKE-UP AIR $4,920 $32,120 Not Implemented
CO0595 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,630 $15,320 Not Implemented
CO0595 # 07 Y:2006 07 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,810 $23,490 Not Implemented
CO0595 # 06 Y:2006 06 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,170 $40,400 Not Implemented
CO0595 # 05 Y:2006 05 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,820 $1,280 Not Implemented
CO0595 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $998 $1,644 Implemented
CO0595 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,390 $290 Implemented
CO0595 # 01 Y:2006 01 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $18,970 $780 Not Implemented
CO0484 # 01 Y:2001 01 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,050 $8,660 n/a
CO0484 # 08 Y:2001 08 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $34,130 $7,350 n/a
CO0484 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $520 $0 n/a
CO0484 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $870 $30 n/a
CO0484 # 05 Y:2001 05 2001 USE SOLAR HEAT TO HEAT MAKE-UP AIR $2,110 $12,600 n/a
CO0484 # 04 Y:2001 04 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,010 $4,000 n/a
CO0484 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,610 $390 n/a