IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0426 # 11 Y:2016 11 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,435 $12,000 Implemented
LE0423 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $3,470 $25 Not Implemented
LE0423 # 02 Y:2016 02 2016 INSTALL TIMERS AND/OR THERMOSTATS $2,422 $50 Not Implemented
LE0423 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,184 $25 Not Implemented
LE0423 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $3,716 $725 Not Implemented
LE0423 # 05 Y:2016 05 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,541 $1,200 Not Implemented
LE0423 # 06 Y:2016 06 2016 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $928 $2,300 Not Implemented
LE0423 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $961 $2,575 Not Implemented
LE0423 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $1,518 $6,016 Not Implemented
LE0423 # 09 Y:2016 09 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,028 $24,500 Not Implemented
LE0423 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,325 $18,675 Not Implemented
CO0733 # 01 Y:2016 01 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,020 $1,730 n/a
CO0733 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $750 n/a
CO0733 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,360 $5,950 n/a
CO0733 # 04 Y:2016 04 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,970 $34,800 n/a
CO0733 # 05 Y:2016 05 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,200 $500 n/a
CO0733 # 06 Y:2016 06 2016 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $2,200 $9,200 n/a
SD0538 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $29,703 $94,750 Not Implemented
SD0538 # 02 Y:2016 02 2016 IMPROVE COMBUSTION CONTROL CAPABILITY $17,613 $46,250 Implemented
SD0538 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,549 $26,272 Implemented
SD0538 # 04 Y:2016 04 2016 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $12,722 $54,880 Not Implemented
SD0538 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $5,664 $2,520 Implemented
SD0538 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,200 $13,950 Implemented
SD0538 # 07 Y:2016 07 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $952 $750 Implemented
SD0538 # 08 Y:2016 08 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $877 $1,988 Not Implemented