IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

406

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0291 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $180 $105 Implemented
SU0265 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $468 $0 Not Implemented
SU0265 # 02 Y:2008 02 2008 USE SYNTHETIC LUBRICANT $191 $0 Not Implemented
SU0265 # 03 Y:2008 03 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $214,622 $23,800 Not Implemented
SU0265 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,615 $252 Implemented
SU0265 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $786 $223 Implemented
SU0265 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,263 $3,368 Not Implemented
SU0265 # 07 Y:2008 07 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $171 $310 Not Implemented
SU0265 # 08 Y:2008 08 2008 OPTIMIZE PLANT POWER FACTOR $921 $4,079 Not Implemented
MA0634 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,014 $119,495 Implemented
MA0634 # 02 Y:2008 02 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $11,407 $20,000 Not Implemented
MA0634 # 03 Y:2008 03 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,058 $3,000 Not Implemented
MA0634 # 04 Y:2008 04 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,932 $2,500 Implemented
MA0634 # 05 Y:2008 05 2008 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $1,034 $6,000 Not Implemented
MA0634 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $498 $500 Implemented
SF0362 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $2,736 $684 Implemented
SF0362 # 02 Y:2008 02 2008 COVER OPEN TANKS $19,051 $2,966 Not Implemented
SF0362 # 03 Y:2008 03 2008 ADD AREA LIGHTING SWITCHES $1,517 $312 Implemented
SF0362 # 04 Y:2008 04 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,745 $1,291 Implemented
SF0362 # 05 Y:2008 05 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $47,707 $15,056 Implemented
SF0362 # 06 Y:2008 06 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,910 $7,463 Not Implemented
SF0362 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $12,488 $14,628 Not Implemented
SF0362 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,951 $11,120 Not Implemented
SF0362 # 09 Y:2008 09 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $488 $1,566 Implemented
MI0164 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $114,642 $3,960 Implemented