IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

548

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0008 # 05 Y:2001 05 2001 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $28,850 $400 n/a
MI0008 # 06 Y:2001 06 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $78,789 $44,200 n/a
MI0008 # 07 Y:2001 07 2001 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $105,300 $1,212 n/a
MI0003 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,015 $10,000 Not Implemented
MI0003 # 02 Y:2001 02 2001 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $40,000 $15,120 Not Implemented
MI0003 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,044 $312 Implemented
MI0003 # 04 Y:2001 04 2001 METER WASTE WATER $25,076 $3,650 Not Implemented
MI0003 # 05 Y:2001 05 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $125,000 $136,000 Not Implemented
MI0003 # 06 Y:2001 06 2001 MOVE PRODUCT USING MECHANICAL MEANS $40,000 $2,900 Implemented
UF0255 # 01 Y:2000 01 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,688 $862 Implemented
UF0255 # 02 Y:2000 02 2000 COMBINE UTILITY METERS $40,200 $4,100 Implemented
UF0255 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,206 $871 Implemented
UF0255 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $349 $0 Implemented
UF0255 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $962 $220 Implemented
UF0255 # 06 Y:2000 06 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $511 $0 Implemented
UF0255 # 07 Y:2000 07 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,500 $8,000 Implemented
UF0255 # 08 Y:2000 08 2000 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $178,412 $250,000 Implemented
UF0253 # 01 Y:2000 01 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,845 $50 n/a
UF0253 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,873 $2,282 n/a
UF0253 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $2,296 $695 n/a
UF0253 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,166 $320 n/a
UF0253 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,643 $0 n/a
UF0253 # 06 Y:2000 06 2000 INSULATE BARE EQUIPMENT $3,090 $690 n/a
UF0253 # 07 Y:2000 07 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $293 $0 n/a
UF0253 # 08 Y:2000 08 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $565 $520 n/a