IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

415

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0087 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,245 $4,500 Not Implemented
MA0087 # 05 Y:1987 05 1987 INSTALL STORM WINDOWS AND DOORS $1,272 $3,530 Not Implemented
MA0087 # 06 Y:1987 06 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,589 $2,249 Not Implemented
MA0087 # 07 Y:1987 07 1987 OPTIMIZE PLANT POWER FACTOR $864 $3,200 Not Implemented
MA0087 # 08 Y:1987 08 1987 AIR CONDITION ONLY SPACE NECESSARY $20,849 $1,360 Not Implemented
MA0087 # 09 Y:1987 09 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,536 $1,350 Implemented
MA0077 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $659 $212 Not Implemented
MA0077 # 02 Y:1986 02 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $370 $753 Not Implemented
MA0077 # 03 Y:1986 03 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,888 $4,650 Not Implemented
MA0077 # 04 Y:1986 04 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,705 $7,200 Not Implemented
MA0077 # 05 Y:1986 05 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $17,850 $22,500 Not Implemented
MA0077 # 06 Y:1986 06 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $40 Not Implemented
MA0077 # 07 Y:1986 07 1986 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,650 $907 Not Implemented
MA0077 # 08 Y:1986 08 1986 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,082 $0 Not Implemented
MA0067 # 01 Y:1986 01 1986 AIR CONDITION ONLY SPACE NECESSARY $262 $0 Implemented
MA0067 # 02 Y:1986 02 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $125 $150 Not Implemented
MA0067 # 03 Y:1986 03 1986 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $484 $900 Implemented
MA0067 # 04 Y:1986 04 1986 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,076 $7,000 Not Implemented
MA0067 # 05 Y:1986 05 1986 RECOVER WASTE HEAT FROM EQUIPMENT $1,611 $4,710 Not Implemented
MA0060 # 01 Y:1986 01 1986 COVER OPEN TANKS $1,979 $207 Not Implemented
MA0060 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,411 $600 Not Implemented
MA0060 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $274 $64 Not Implemented
MA0060 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $131 $100 Not Implemented
MA0060 # 05 Y:1986 05 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,064 $440 Not Implemented
MA0060 # 06 Y:1986 06 1986 REPAIR OR REPLACE STEAM TRAPS $8,227 $195 Not Implemented