Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
415
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0087 # 04 Y:1987 | 04 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,245 | $4,500 | Not Implemented |
MA0087 # 05 Y:1987 | 05 | 1987 | INSTALL STORM WINDOWS AND DOORS | $1,272 | $3,530 | Not Implemented |
MA0087 # 06 Y:1987 | 06 | 1987 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,589 | $2,249 | Not Implemented |
MA0087 # 07 Y:1987 | 07 | 1987 | OPTIMIZE PLANT POWER FACTOR | $864 | $3,200 | Not Implemented |
MA0087 # 08 Y:1987 | 08 | 1987 | AIR CONDITION ONLY SPACE NECESSARY | $20,849 | $1,360 | Not Implemented |
MA0087 # 09 Y:1987 | 09 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,536 | $1,350 | Implemented |
MA0077 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $659 | $212 | Not Implemented |
MA0077 # 02 Y:1986 | 02 | 1986 | INSTALL / REPAIR INSULATION ON STEAM LINES | $370 | $753 | Not Implemented |
MA0077 # 03 Y:1986 | 03 | 1986 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,888 | $4,650 | Not Implemented |
MA0077 # 04 Y:1986 | 04 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,705 | $7,200 | Not Implemented |
MA0077 # 05 Y:1986 | 05 | 1986 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $17,850 | $22,500 | Not Implemented |
MA0077 # 06 Y:1986 | 06 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $580 | $40 | Not Implemented |
MA0077 # 07 Y:1986 | 07 | 1986 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $1,650 | $907 | Not Implemented |
MA0077 # 08 Y:1986 | 08 | 1986 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,082 | $0 | Not Implemented |
MA0067 # 01 Y:1986 | 01 | 1986 | AIR CONDITION ONLY SPACE NECESSARY | $262 | $0 | Implemented |
MA0067 # 02 Y:1986 | 02 | 1986 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $125 | $150 | Not Implemented |
MA0067 # 03 Y:1986 | 03 | 1986 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $484 | $900 | Implemented |
MA0067 # 04 Y:1986 | 04 | 1986 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,076 | $7,000 | Not Implemented |
MA0067 # 05 Y:1986 | 05 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,611 | $4,710 | Not Implemented |
MA0060 # 01 Y:1986 | 01 | 1986 | COVER OPEN TANKS | $1,979 | $207 | Not Implemented |
MA0060 # 02 Y:1986 | 02 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,411 | $600 | Not Implemented |
MA0060 # 03 Y:1986 | 03 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $274 | $64 | Not Implemented |
MA0060 # 04 Y:1986 | 04 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $131 | $100 | Not Implemented |
MA0060 # 05 Y:1986 | 05 | 1986 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,064 | $440 | Not Implemented |
MA0060 # 06 Y:1986 | 06 | 1986 | REPAIR OR REPLACE STEAM TRAPS | $8,227 | $195 | Not Implemented |