IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0462 # 01 Y:2015 01 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,802 $7,405 Not Implemented
UM0462 # 02 Y:2015 02 2015 HEAT WATER WITH EXHAUST HEAT $16,361 $20,000 Not Implemented
UM0462 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $23,500 $8,000 Not Implemented
UM0462 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,638 $4,500 Not Implemented
UM0462 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,224 $1,000 Not Implemented
UM0462 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $2,455 $4,800 Not Implemented
AM0689 # 01 Y:2015 01 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,100 $5,270 Implemented
AM0689 # 02 Y:2015 02 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $14,595 $4,000 Implemented
AM0689 # 03 Y:2015 03 2015 OPTIMIZE PLANT POWER FACTOR $8,425 $12,120 Not Implemented
AM0689 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,740 $1,840 Implemented
AM0689 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,780 $3,990 Implemented
AM0689 # 06 Y:2015 06 2015 INSTALL SKYLIGHTS $1,770 $5,300 Not Implemented
AM0689 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $980 $1,170 Not Implemented
AM0689 # 08 Y:2015 08 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $380 $0 Implemented
MI0285 # 01 Y:2015 01 2015 COVER OPEN TANKS $36,126 $25,100 Not Implemented
MI0285 # 02 Y:2015 02 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $22,640 $52,920 Implemented
MI0285 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,400 $80 Implemented
MI0285 # 04 Y:2015 04 2015 LOWER CEILING TO REDUCE CONDITIONED SPACE $13,892 $76,650 Implemented
MI0285 # 05 Y:2015 05 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,325 $4,691 Not Implemented
MI0285 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,096 $1,660 Not Implemented
MI0285 # 07 Y:2015 07 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,621 $5,370 Not Implemented
MI0285 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $3,310 $6,660 Not Implemented
MI0285 # 09 Y:2015 09 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,010 $40 Not Implemented
MI0284 # 01 Y:2015 01 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $77,529 $180,000 Implemented
MI0284 # 02 Y:2015 02 2015 LOWER CEILING TO REDUCE CONDITIONED SPACE $28,449 $55,650 Implemented