IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1507 # 06 Y:2015 06 2015 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $4,546 $0 Not Implemented
UK1507 # 07 Y:2015 07 2015 UPGRADE CONTROLS ON COMPRESSORS $6,513 $7,500 Implemented
UK1507 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,131 $1,500 Not Implemented
UK1507 # 09 Y:2015 09 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $387 $0 Implemented
UK1507 # 10 Y:2015 10 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $573 $420 Not Implemented
UK1507 # 11 Y:2015 11 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $217 $570 Not Implemented
UK1507 # 12 Y:2015 12 2015 DEVELOP A REPAIR/REPLACE POLICY $3,131 $1,576 Not Implemented
UK1507 # 13 Y:2015 13 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $660 $0 Implemented
UK1507 # 14 Y:2015 14 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $354 $0 Not Implemented
UK1507 # 15 Y:2015 15 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,875 $1,500 Not Implemented
UK1507 # 16 Y:2015 16 2015 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,962 $7,200 Not Implemented
UK1507 # 17 Y:2015 17 2015 PREHEAT COMBUSTION AIR WITH WASTE HEAT $6,283 $4,078 Not Implemented
UK1507 # 18 Y:2015 18 2015 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,118 $996 Not Implemented
UK1507 # 19 Y:2015 19 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,614 $3,000 Not Implemented
UA0146 # 01 Y:2015 01 2015 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $47,379 $42,596 Not Implemented
UA0146 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,612 $800 Implemented
UA0146 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,141 $27,750 Implemented
UA0146 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,985 $2,995 Not Implemented
UA0146 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,170 $20,711 Not Implemented
UA0146 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $1,518 $1,802 Not Implemented
UA0146 # 07 Y:2015 07 2015 INSTALL TIMERS AND/OR THERMOSTATS $2,583 $80 Implemented
OK0922 # 01 Y:2015 01 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $950 $580 Not Implemented
OK0922 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,502 $30,324 Implemented
OK0922 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,204 $77,600 Implemented
OK0922 # 04 Y:2015 04 2015 OPTIMIZE PLANT POWER FACTOR $37,221 $46,451 Not Implemented