IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

414

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0093 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $1,874 $500 Not Implemented
BS0093 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $999 $4,977 Not Implemented
BS0093 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $146 $30 Not Implemented
BS0093 # 04 Y:2017 04 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $58 $590 Not Implemented
BS0093 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $203 $628 Not Implemented
UA0173 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $62,936 $136,836 Not Implemented
UA0173 # 02 Y:2017 02 2017 USE PHOTOCELL CONTROLS $5,531 $2,748 Implemented
UA0173 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $2,924 $880 Implemented
UA0173 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,905 $500 Not Implemented
UA0173 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,474 $5,695 Implemented
UA0173 # 06 Y:2017 06 2017 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $35,206 $1,000 Not Implemented
UA0173 # 07 Y:2017 07 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $21,010 $28,800 Not Implemented
UA0173 # 08 Y:2017 08 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,811 $150 Implemented
UM0480 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $35,941 $20,000 n/a
UM0480 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,908 $2,500 n/a
UM0480 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,601 $28,500 n/a
UM0480 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,087 $6,000 n/a
TT0183 # 01 Y:2017 01 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $22,849 $30,000 Not Implemented
TT0183 # 02 Y:2017 02 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,441 $7,000 Implemented
TT0183 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,488 $5,100 Implemented
TT0183 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,005 $24,492 Not Implemented
TT0183 # 05 Y:2017 05 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,947 $1,400 Not Implemented
TT0183 # 06 Y:2017 06 2017 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $2,782 $7,000 Not Implemented
TT0183 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,424 $125 Implemented
AM0722 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $149,000 $471,100 Implemented