IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0050 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $47,772 $272,678 n/a
TR0050 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,139 $37,400 n/a
LS2404 # 01 Y:2024 01 2024 INSTALL OCCUPANCY SENSORS $5,988 $275 Implemented
LS2404 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,008 $75 Not Implemented
LS2404 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,054 $135 Implemented
LS2404 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,771 $3,080 Implemented
LS2404 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,458 $11,138 Implemented
LS2403 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,116 $25 Not Implemented
LS2403 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,928 $25 Implemented
LS2403 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,306 $3,600 Implemented
LS2403 # 04 Y:2024 04 2024 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,205 $950 Implemented
SJ0011 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,495 $51,522 Not Implemented
SJ0011 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,700 $28,158 Not Implemented
SJ0011 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $787 $622 Not Implemented
SJ0011 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $4,268 $3,475 Not Implemented
SJ0011 # 05 Y:2024 05 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,528 $468 Not Implemented
SJ0011 # 06 Y:2024 06 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13 $71 Not Implemented
SJ0011 # 07 Y:2024 07 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,389 $0 Implemented
SJ0011 # 08 Y:2024 08 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $207,539 $726,190 Not Implemented
AM0900 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,923 $10,333 n/a
AM0900 # 02 Y:2024 02 2024 OPTIMIZE PLANT POWER FACTOR $19,139 $30,070 n/a
AM0900 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,283 $273 n/a
AM0900 # 04 Y:2024 04 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,024 $546 n/a
AM0900 # 05 Y:2024 05 2024 USE SYNTHETIC LUBRICANT $727 $546 n/a
AM0900 # 06 Y:2024 06 2024 RECOVER WASTE HEAT FROM EQUIPMENT $29,310 $69,700 n/a