IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

625

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0056 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $223 $136 Not Implemented
UU0056 # 06 Y:2003 06 2003 RECOVER WASTE HEAT FROM EQUIPMENT $110 $490 Implemented
MA0544 # 01 Y:2003 01 2003 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $3,663 $2,000 Implemented
UU0055 # 02 Y:2003 02 2003 ADD AREA LIGHTING SWITCHES $659 $500 Not Implemented
UU0055 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $430 $1,870 Not Implemented
UU0055 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $710 $710 Not Implemented
UU0055 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,273 $7,500 Not Implemented
MA0544 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $543 $20 Implemented
UU0055 # 07 Y:2003 07 2003 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $12,956 $21,000 Not Implemented
UU0055 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $889 $349 Not Implemented
UU0055 # 05 Y:2003 05 2003 USE HEAT PUMP FOR SPACE CONDITIONING $2,492 $39,000 Not Implemented
MA0544 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $2,425 $2,000 Not Implemented
MA0544 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,646 $6,156 Implemented
MA0544 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $1,236 $600 Not Implemented
GT0770 # 02 Y:2003 02 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $900 $2,600 Not Implemented
GT0770 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $109 $287 Implemented
GT0770 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $490 $0 Implemented
GT0770 # 06 Y:2003 06 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $6,626 $0 Implemented
GT0770 # 05 Y:2003 05 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,380 $0 Implemented
GT0770 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,276 $2,600 Not Implemented
MS0236 # 02 Y:2003 02 2003 USE PHOTOCELL CONTROLS $2,939 $778 n/a
MS0236 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,626 $178 n/a
MS0236 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,290 $371 n/a
OK0674 # 01 Y:2003 01 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,662 $13,792 Implemented
MS0236 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,086 $36,955 n/a