IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

364

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2304 # 05 Y:2023 05 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,740 $26,230 Not Implemented
UC2304 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $99 $260 Not Implemented
UC2304 # 08 Y:2023 08 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $79,562 $411,323 Not Implemented
MA0745 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,433 $1,224 Implemented
MA0745 # 03 Y:2015 03 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,022 $36,150 Implemented
MA0745 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,700 $3,600 Not Implemented
MA0736 # 08 Y:2014 08 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $655 $500 Not Implemented
MA0736 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,318 $4,000 Implemented
MA0736 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,069 $6,500 Not Implemented
MA0736 # 05 Y:2014 05 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,360 $500 Implemented
MA0736 # 04 Y:2014 04 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,218 $4,000 Implemented
MA0736 # 03 Y:2014 03 2014 REDUCE VENTILATION AIR $7,297 $2,550 Not Implemented
MA0736 # 02 Y:2014 02 2014 OPTIMIZE PLANT POWER FACTOR $14,457 $14,774 Implemented
MA0736 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,138 $109,865 Implemented
MA0735 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $23,815 $17,955 Not Implemented
MA0735 # 02 Y:2014 02 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $3,745 $3,519 Implemented
MA0735 # 03 Y:2014 03 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,084 $500 Implemented
MA0735 # 04 Y:2014 04 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,027 $3,000 Implemented
MA0735 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,377 $4,200 Implemented
MA0733 # 01 Y:2014 01 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $65,768 $10,000 Implemented
MA0733 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,616 $71,100 Implemented
MA0733 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,971 $1,800 Not Implemented
MA0733 # 04 Y:2014 04 2014 REDUCE VENTILATION AIR $5,225 $7,500 Not Implemented
MA0733 # 05 Y:2014 05 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,595 $13,800 Not Implemented
MA0733 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,532 $3,300 Not Implemented