IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

883

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0112 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $2,210 $640 Implemented
UF0112 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $29,665 $30,154 Implemented
UF0112 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,316 $1,500 Implemented
UF0112 # 07 Y:1995 07 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,584 $50,400 Not Implemented
UF0112 # 08 Y:1995 08 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $208 $950 Implemented
UF0112 # 09 Y:1995 09 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $374 $520 Not Implemented
UF0112 # 10 Y:1995 10 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,129 $3,000 Implemented
UF0112 # 11 Y:1995 11 1995 OPTIMIZE PLANT POWER FACTOR $2,841 $12,951 Implemented
NV0025 # 01 Y:1995 01 1995 PAY UTILITY BILLS ON TIME $5,674 $0 Implemented
NV0025 # 02 Y:1995 02 1995 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $90,007 $29,278 Not Implemented
NV0025 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,176 $717 Not Implemented
NV0025 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,664 $21,633 Not Implemented
NV0025 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $644 $300 Implemented
NV0025 # 06 Y:1995 06 1995 OPTIMIZE PLANT POWER FACTOR $1,602 $5,472 Not Implemented
NV0023 # 01 Y:1995 01 1995 PAY UTILITY BILLS ON TIME $1,013 $0 Implemented
NV0023 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,321 $461 Not Implemented
NV0023 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $1,781 $1,245 Implemented
NV0023 # 04 Y:1995 04 1995 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $4,488 $1,600 Not Implemented
NV0023 # 05 Y:1995 05 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $31,162 $100,000 Not Implemented
NV0023 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $2,296 $224 Not Implemented
NV0023 # 07 Y:1995 07 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,613 $694 Not Implemented
NV0023 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $424 $100 Implemented
WV0056 # 01 Y:1995 01 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,069 $7,326 Not Implemented
WV0056 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,678 $250 Implemented
WV0056 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,010 $800 Not Implemented