IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0169 # 10 Y:2023 10 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,071 $15,432 Implemented
IP0169 # 11 Y:2023 11 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,267 $5,079 Implemented
IP0169 # 12 Y:2023 12 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,942 $9,196 Not Implemented
IP0169 # 13 Y:2023 13 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,020 $7,379 Implemented
IP0169 # 14 Y:2023 14 2023 DISCONNECT BALLASTS $7 $20 Implemented
IP0169 # 15 Y:2023 15 2023 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $10,836 $47,613 Not Implemented
NL0076 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $42,345 $20,000 Not Implemented
NL0076 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $24,481 $25,000 Not Implemented
NL0076 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,256 $4,500 Implemented
NL0076 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,880 $12,650 Not Implemented
NL0076 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,194 $140 Implemented
NL0076 # 06 Y:2022 06 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $4,338 $7,210 Implemented
NL0076 # 07 Y:2022 07 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,084 $35 Not Implemented
CI0006 # 01 Y:2022 01 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $28,328 $32,800 Not Implemented
CI0006 # 02 Y:2022 02 2022 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $26,391 $90,000 Not Implemented
CI0006 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $22,728 $6,000 Not Implemented
CI0006 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $14,859 $82,655 Not Implemented
CI0006 # 05 Y:2022 05 2022 REPLACE BOILER $13,563 $27,000 Not Implemented
CI0006 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,279 $500 Not Implemented
CI0006 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,588 $1,342 Not Implemented
CI0005 # 01 Y:2022 01 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $38,200 $16,400 Not Implemented
CI0005 # 02 Y:2022 02 2022 REPLACE BOILER $15,803 $9,000 Not Implemented
CI0005 # 03 Y:2022 03 2022 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $9,639 $30,000 Not Implemented
CI0005 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,840 $300 Not Implemented
CI0005 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $3,625 $13,372 Not Implemented