IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,156

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0515 # 03 Y:2002 03 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,060 $0 Not Implemented
MA0515 # 04 Y:2002 04 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $717 $0 Implemented
LM0040 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,685 $450 Not Implemented
LM0040 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,048 $600 Not Implemented
LM0040 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,476 $288 Implemented
LM0040 # 04 Y:2002 04 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,360 $1,440 Not Implemented
LM0040 # 05 Y:2002 05 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,888 $9,000 Not Implemented
LM0040 # 06 Y:2002 06 2002 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $108,300 $200 Not Implemented
LM0040 # 07 Y:2002 07 2002 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $45,250 $1,332 Not Implemented
LM0040 # 08 Y:2002 08 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $13,000 $3,900 Not Implemented
CO0505 # 01 Y:2002 01 2002 COVER OPEN TANKS $18,110 $30,000 Not Implemented
CO0505 # 02 Y:2002 02 2002 COVER OPEN TANKS $11,730 $15,600 Not Implemented
CO0505 # 03 Y:2002 03 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,940 $5,400 Implemented
CO0505 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,800 $600 Implemented
CO0505 # 05 Y:2002 05 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $2,400 $1,680 Not Implemented
CO0505 # 06 Y:2002 06 2002 USE OPTIMUM THICKNESS INSULATION $1,260 $2,500 Not Implemented
CO0505 # 07 Y:2002 07 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $770 $60 Implemented
LM0039 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,575 $2,880 Not Implemented
LM0039 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,338 $550 Not Implemented
LM0039 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $211 $228 Not Implemented
LM0039 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,154 $0 Not Implemented
LM0039 # 05 Y:2002 05 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,496 $900 Not Implemented
LM0039 # 06 Y:2002 06 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $20,000 $600 Implemented
LM0039 # 07 Y:2002 07 2002 MODIFY STARTUP/SHUTDOWN TIMES $10,263 $300 Not Implemented
AS0327 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,614 $200 Implemented