Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,620
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0187 # 05 Y:2000 | 05 | 2000 | USE SYNTHETIC LUBRICANT | $1,056 | $350 | Implemented |
WV0187 # 06 Y:2000 | 06 | 2000 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $569 | $300 | Not Implemented |
WV0187 # 07 Y:2000 | 07 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $815 | $740 | Implemented |
WV0187 # 08 Y:2000 | 08 | 2000 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,120 | $1,350 | Not Implemented |
WV0187 # 09 Y:2000 | 09 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $28,444 | $15,958 | Implemented |
WV0187 # 10 Y:2000 | 10 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $252 | $50 | Implemented |
WV0187 # 11 Y:2000 | 11 | 2000 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $5,304 | $75 | Implemented |
WV0187 # 12 Y:2000 | 12 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $20,000 | $7,000 | Not Implemented |
WV0187 # 13 Y:2000 | 13 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $15,000 | $1,200 | Not Implemented |
UM0149 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $836 | $500 | Implemented |
UM0149 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $618 | $200 | Implemented |
UM0149 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,322 | $1,500 | Not Implemented |
UM0149 # 04 Y:1999 | 04 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,107 | $10,500 | Not Implemented |
UM0149 # 05 Y:1999 | 05 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,804 | $0 | Not Implemented |
UM0149 # 06 Y:1999 | 06 | 1999 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $8,500 | $40,000 | Implemented |
UM0149 # 07 Y:1999 | 07 | 1999 | EXPAND OPERATIONS INTO UNUSED SPACE | $357,000 | $714,000 | Not Implemented |
UD0580 # 01 Y:1999 | 01 | 1999 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $862,392 | $1,300,000 | Not Implemented |
UD0580 # 02 Y:1999 | 02 | 1999 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $134,400 | $400,000 | Not Implemented |
UD0580 # 03 Y:1999 | 03 | 1999 | RECOVER AND REUSE COOLING WATER | $52,000 | $140,000 | Not Implemented |
UD0580 # 04 Y:1999 | 04 | 1999 | MOVE PRODUCT USING MECHANICAL MEANS | $39,393 | $10,000 | Not Implemented |
UD0580 # 05 Y:1999 | 05 | 1999 | USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER | $27,840 | $3,500 | Implemented |
UD0580 # 06 Y:1999 | 06 | 1999 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $27,804 | $11,744 | Implemented |
UD0580 # 07 Y:1999 | 07 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,051 | $30,337 | Implemented |
UD0580 # 08 Y:1999 | 08 | 1999 | FILTER AND REUSE HYDRAULIC OIL | $1,713 | $2,500 | Not Implemented |
UD0580 # 09 Y:1999 | 09 | 1999 | SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED | $1,418 | $0 | Not Implemented |