Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,208
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0008 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $263 | $210 | Not Implemented |
MU0008 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,317 | $2,520 | Implemented |
MU0008 # 03 Y:2022 | 03 | 2022 | USE OPTIMUM TEMPERATURE | $168 | $0 | Implemented |
MU0008 # 04 Y:2022 | 04 | 2022 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $2,790 | $580 | Not Implemented |
MU0008 # 05 Y:2022 | 05 | 2022 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $11,502 | $0 | Not Implemented |
MA0844 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $9,380 | $10,000 | Not Implemented |
MA0844 # 02 Y:2022 | 02 | 2022 | OPTIMIZE PLANT POWER FACTOR | $5,525 | $7,135 | Not Implemented |
MA0844 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,466 | $23,175 | Implemented |
MA0844 # 04 Y:2022 | 04 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $853 | $4,200 | Not Implemented |
MA0844 # 05 Y:2022 | 05 | 2022 | INSULATE BARE EQUIPMENT | $597 | $895 | Not Implemented |
MA0844 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $574 | $2,100 | Not Implemented |
SU0514 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,008 | $0 | Not Implemented |
SU0514 # 02 Y:2022 | 02 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $22,430 | $675 | Not Implemented |
SU0514 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,219 | $1,953 | Not Implemented |
SU0514 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,996 | $9,943 | Not Implemented |
SU0514 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $46 | $49 | Not Implemented |
SU0514 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,774 | $3,179 | Not Implemented |
IC0264 # 01 Y:2022 | 01 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,084 | $2,113 | Not Implemented |
IC0264 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,944 | $4,150 | Implemented |
IC0264 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,361 | $10,377 | Implemented |
IC0264 # 04 Y:2022 | 04 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $2,600 | $15,017 | Not Implemented |
IC0264 # 05 Y:2022 | 05 | 2022 | OPTIMIZE PLANT POWER FACTOR | $3,552 | $15,893 | Not Implemented |
IC0264 # 06 Y:2022 | 06 | 2022 | REDUCE VENTILATION AIR | $1,650 | $6,000 | Implemented |
UL2207 # 01 Y:2022 | 01 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $12,180 | $0 | Not Implemented |
UL2207 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,984 | $83,246 | Not Implemented |