IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0008 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $263 $210 Not Implemented
MU0008 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,317 $2,520 Implemented
MU0008 # 03 Y:2022 03 2022 USE OPTIMUM TEMPERATURE $168 $0 Implemented
MU0008 # 04 Y:2022 04 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $2,790 $580 Not Implemented
MU0008 # 05 Y:2022 05 2022 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $11,502 $0 Not Implemented
MA0844 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $9,380 $10,000 Not Implemented
MA0844 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $5,525 $7,135 Not Implemented
MA0844 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,466 $23,175 Implemented
MA0844 # 04 Y:2022 04 2022 RECOVER WASTE HEAT FROM EQUIPMENT $853 $4,200 Not Implemented
MA0844 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $597 $895 Not Implemented
MA0844 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $574 $2,100 Not Implemented
SU0514 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,008 $0 Not Implemented
SU0514 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $22,430 $675 Not Implemented
SU0514 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,219 $1,953 Not Implemented
SU0514 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,996 $9,943 Not Implemented
SU0514 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46 $49 Not Implemented
SU0514 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,774 $3,179 Not Implemented
IC0264 # 01 Y:2022 01 2022 RECOVER WASTE HEAT FROM EQUIPMENT $5,084 $2,113 Not Implemented
IC0264 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,944 $4,150 Implemented
IC0264 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,361 $10,377 Implemented
IC0264 # 04 Y:2022 04 2022 UPGRADE CONTROLS ON COMPRESSORS $2,600 $15,017 Not Implemented
IC0264 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $3,552 $15,893 Not Implemented
IC0264 # 06 Y:2022 06 2022 REDUCE VENTILATION AIR $1,650 $6,000 Implemented
UL2207 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,180 $0 Not Implemented
UL2207 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,984 $83,246 Not Implemented