Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,208
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2207 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,572 | $18,120 | Not Implemented |
UL2207 # 04 Y:2022 | 04 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,876 | $0 | Not Implemented |
UL2207 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,845 | $30,000 | Not Implemented |
UL2207 # 06 Y:2022 | 06 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $178,671 | $2,038,848 | Not Implemented |
UL2207 # 07 Y:2022 | 07 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $135,226 | $2,377,313 | Not Implemented |
TT0280 # 01 Y:2022 | 01 | 2022 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $52,932 | $4,800 | Implemented |
TT0280 # 02 Y:2022 | 02 | 2022 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $29,003 | $9,880 | Implemented |
TT0280 # 03 Y:2022 | 03 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $26,518 | $6,720 | Not Implemented |
TT0280 # 04 Y:2022 | 04 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $21,150 | $0 | Implemented |
TT0280 # 05 Y:2022 | 05 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $19,766 | $0 | Implemented |
TT0280 # 06 Y:2022 | 06 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $14,562 | $650 | Not Implemented |
TT0280 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,878 | $5,100 | Not Implemented |
TT0280 # 08 Y:2022 | 08 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,072 | $3,400 | Not Implemented |
TT0280 # 09 Y:2022 | 09 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,550 | $0 | Not Implemented |
TT0280 # 10 Y:2022 | 10 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $298 | $1,247 | Not Implemented |
TT0276 # 01 Y:2022 | 01 | 2022 | ADOPT IN-HOUSE MATERIAL GENERATION | $42,153 | $40,000 | Not Implemented |
TT0276 # 02 Y:2022 | 02 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $125,911 | $145,300 | Not Implemented |
TT0276 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $37,334 | $25,000 | Not Implemented |
TT0276 # 04 Y:2022 | 04 | 2022 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $35,279 | $40,000 | Not Implemented |
TT0276 # 05 Y:2022 | 05 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,303 | $60 | Implemented |
TT0276 # 06 Y:2022 | 06 | 2022 | OPTIMIZE PLANT POWER FACTOR | $16,112 | $15,000 | Not Implemented |
TT0276 # 07 Y:2022 | 07 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,657 | $3,175 | Implemented |
TT0276 # 08 Y:2022 | 08 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,344 | $24,750 | Implemented |
TT0276 # 09 Y:2022 | 09 | 2022 | CHANGE OPERATING CONDITIONS | $6,750 | $2,000 | Implemented |
TT0276 # 10 Y:2022 | 10 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,766 | $40 | Not Implemented |