IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

317

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0172 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,195 $123 Implemented
UD0172 # 02 Y:1985 02 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,225 $50 Implemented
UD0172 # 01 Y:1985 01 1985 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,203 $150 Implemented
PV0006 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $175 $0 Not Implemented
PV0005 # 02 Y:1985 02 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,834 $0 Not Implemented
PV0005 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $437 $17 Not Implemented
MA0038 # 02 Y:1985 02 1985 RECOVER WASTE HEAT FROM EQUIPMENT $3,400 $2,938 Implemented
OK0178 # 10 Y:1985 10 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $579 $250 Implemented
OK0178 # 09 Y:1985 09 1985 OPTIMIZE PLANT POWER FACTOR $528 $1,795 Not Implemented
OK0178 # 08 Y:1985 08 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $64 $55 Implemented
OK0178 # 07 Y:1985 07 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $244 $200 Implemented
OK0178 # 06 Y:1985 06 1985 INSULATE BARE EQUIPMENT $1,732 $636 Not Implemented
OK0178 # 05 Y:1985 05 1985 COVER OPEN TANKS $5,600 $9,888 Not Implemented
OK0178 # 04 Y:1985 04 1985 INSTALL TIMERS AND/OR THERMOSTATS $178 $150 Implemented
OK0178 # 03 Y:1985 03 1985 USE RADIANT HEATER FOR SPOT HEATING $1,400 $2,120 Implemented
OK0178 # 02 Y:1985 02 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,524 $4,000 Implemented
OK0178 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,258 $800 Not Implemented
TN0257 # 01 Y:1985 01 1985 USE HEAT PUMP FOR SPACE CONDITIONING $17,233 $429,000 Not Implemented
TN0257 # 02 Y:1985 02 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,904 $37,200 Not Implemented
TN0257 # 03 Y:1985 03 1985 COVER OPEN TANKS $3,102 $200 Not Implemented
TN0257 # 04 Y:1985 04 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,915 $0 Not Implemented
TN0257 # 05 Y:1985 05 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,048 $450 Implemented
OK0179 # 01 Y:1985 01 1985 OPTIMIZE PLANT POWER FACTOR $1,296 $3,847 Not Implemented
OK0179 # 02 Y:1985 02 1985 INSTALL TIMERS AND/OR THERMOSTATS $271 $600 Implemented
OK0179 # 03 Y:1985 03 1985 USE RADIANT HEATER FOR SPOT HEATING $12,890 $4,700 Implemented