IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0825 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,310 $45 Not Implemented
SD0608 # 01 Y:2021 01 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,361 $152,000 Not Implemented
SD0608 # 02 Y:2021 02 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,468 $18,900 Not Implemented
SD0608 # 03 Y:2021 03 2021 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,270 $7,600 Not Implemented
SD0608 # 04 Y:2021 04 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,201 $6,200 Not Implemented
SD0608 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,225 $143 Not Implemented
SD0608 # 06 Y:2021 06 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $544 $1,695 Not Implemented
IP0148 # 01 Y:2021 01 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $104 $0 Not Implemented
IP0148 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $844 $0 Implemented
IP0148 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,097 $185 Implemented
IP0148 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $126 $504 Not Implemented
IP0148 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $125 $522 Implemented
UD1028 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,034 $0 Not Implemented
UD1028 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $782 $0 Implemented
UD1028 # 03 Y:2021 03 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $196 $0 Not Implemented
UD1028 # 04 Y:2021 04 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,469 $4,200 Not Implemented
UD1028 # 05 Y:2021 05 2021 RECOVER WASTE HEAT FROM EQUIPMENT $4,623 $5,000 Not Implemented
UD1028 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,408 $2,814 Implemented
UD1028 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $807 $0 Not Implemented
UD1028 # 08 Y:2021 08 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $210 $600 Not Implemented
UD1028 # 09 Y:2021 09 2021 INSTALL OCCUPANCY SENSORS $3,730 $5,760 Not Implemented
UU0184 # 01 Y:2021 01 2021 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $26,453 $92,586 Implemented
UU0184 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,459 $2,700 Not Implemented
UU0184 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $2,375 $6,744 Not Implemented
UU0184 # 04 Y:2021 04 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $1,530 $500 Not Implemented