IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,133

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0027 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,566 $250 Not Implemented
NV0027 # 05 Y:1995 05 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $886 $1,415 Implemented
NV0027 # 06 Y:1995 06 1995 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $605 $112 Not Implemented
NV0027 # 07 Y:1995 07 1995 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,845 $1,900 Not Implemented
BD0025 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,949 $12,980 Implemented
BD0025 # 02 Y:1995 02 1995 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,321 $8,450 Not Implemented
BD0025 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,253 $400 Implemented
BD0025 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,558 $60 Implemented
BD0025 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $4,840 $2,500 Implemented
BD0025 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $2,685 $1,050 Implemented
BD0025 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,086 $712 Implemented
ND0208 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,080 $945 Not Implemented
ND0208 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $9,644 $500 Not Implemented
ND0208 # 03 Y:1995 03 1995 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,127 $1,378 Not Implemented
ND0208 # 04 Y:1995 04 1995 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $609 $300 Not Implemented
ND0208 # 05 Y:1995 05 1995 PAY UTILITY BILLS ON TIME $1,712 $0 Not Implemented
ND0208 # 06 Y:1995 06 1995 OPTIMIZE PLANT POWER FACTOR $18,063 $16,121 Not Implemented
ND0208 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $477 $429 Not Implemented
ND0208 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $127 $350 Not Implemented
ND0208 # 09 Y:1995 09 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,738 $15,425 Not Implemented
ND0208 # 10 Y:1995 10 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $186 $560 Not Implemented
ND0208 # 11 Y:1995 11 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $142 $550 Not Implemented
ND0208 # 12 Y:1995 12 1995 ELIMINATE/REDUCE AN OPERATION $12,600 $300 Not Implemented
MA0334 # 01 Y:1995 01 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,139 $0 Implemented
MA0334 # 02 Y:1995 02 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,782 $29,500 Not Implemented